Laserfiche WebLink
<br />$15,436,066. This was approximately $4 million <br />below the Engineer's estimate. As you know, this <br />will be the first underground powerplant to be <br />constructed by the Bureau of Reclamation. <br /> <br />I <br /> <br />Also on the Curecanti Project the Colorado <br />Department of Highways has opened bids for <br />another segment of the highway for relocation <br />around Blue Mesa Reservoir. This contract for <br />about $2.7 million includes six miles of Highway <br />50 and three miles of Colorado Highway 149. In <br />this schedule will be included a rather spectacu- <br />lar bridge which will be 518-feet-long and will <br />cross back over the Gunnison River 70 feet above <br />the river. <br /> <br />As far as the transmission lines are con- <br />cerned, I think we mentioned before that all of <br />the original network of lines necessary to <br />deliver the initial power from the Storage <br />Project are under construction. Also contracts <br />have been awarded for construction of the prin- <br />cipal substations at Pinnacle Peak, Curecanti, <br />Hayden and Shiprock. Now the remaining trans- <br />mission lines left to be constructed include the <br />230-kv line from pinnacle Peak to Mesa and the <br />line that Jim just mentioned in here from Hayden <br />to Archer. Archer is a substation just on the <br />outskirts of Cheyenne. There is also a revision <br />in the original Craig-Oak Creek line to bring <br />this line into the Hayden Substation and an 8- <br />mile experimental section in the Glen Canyon- <br />Shiprock 230-kv line. <br /> <br />I <br /> <br />Temporary office quarters for the Power <br />Operations Center for the storage Project were <br />opened in Montrose during March. Award of con- <br />tract is pending on the microwave radio system <br />for supervision and control of the power system <br />at this Operation Office. <br /> <br />I think a few of you gentlemen were in <br />attendance at the recent dedication of Crawford <br />Dam by the Secretary. This represents another <br />project. that is completed on the western slope, <br />or substantially completed. It is in the stage <br />of seasoning and testing of the project works. <br />