My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02033
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:20 PM
Creation date
10/4/2006 7:08:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />very mediocre runoff and allowing for some <br />storage in Flaming Gorge and Navajo Reservoirs, <br />we should be able to store about 5 million acre- <br />feet in Lake Powell by midsummer and we would <br />hope to reach the minimum power pool level, which <br />is 6 million acre-feet of water in Powell Reser- <br />voir, at an elevation of 3,490, early in 1964. <br /> <br />As you know, the filling criteria requires <br />that the rated head be maintained at Lake Mead. <br />This contains 14.5 million acre-feet at an eleva- <br />tion of 1,123 feet. Once the minimum power pool <br />level is reached in Glen our problem is sub- <br />stantially over with. The elevation of Lake <br />Mead, we anticipate, will be dropping below <br />rated-head level about the beginning of next <br />year's snowmelt runoff or about this time. Thus, <br />the acquisition of the minimum power pool in <br />Lake Powell is somewhat critical. However, we <br />estimate that we will be able to generate from <br />Glen Canyon in the midsummer of 1964 as scheduled. <br /> <br />Now going to Lake powell, I think these <br />items are of interest. By midsummer we estimate <br />that Lake Powell will be 150 miles long and will <br />contain about 65 square miles of water surface. <br />Already the reservoir is being used by recrea- <br />tionists and boating enthusiasts and of interest <br />to fishermen, already 700,000 small trout have <br />been planted in the reservoir. By August, <br />through the cooperation of the states of Utah <br />and Arizona and the U. S. Fish and Wildlife Ser- <br />vice, we hope to have 8 million trout planted <br />in this reservoir. <br /> <br />I <br /> <br />Moving on to Flaming Gorge, power is <br />scheduled to be produced from there in September. <br />The concrete deck on the spillway bridge, the <br />last link across the dam, was finished this month. <br />This provides for limited access across the dam <br />and we hope to have unrestricted public access by <br />August. Iii thin the powerhouse the completion <br />contractor is working on installation of the <br />generators, and in the switchyard area trans- <br />mission towers are being erected. <br /> <br />At the present time Flaming Gorge Reservoir <br />
The URL can be used to link to this page
Your browser does not support the video tag.