My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02033
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:20 PM
Creation date
10/4/2006 7:08:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />locations of roads around the reservoir, etc., <br />are progressing quite rapidly now since the <br />weather has cleared up. <br /> <br />In the line of further, you might say, <br />investigations regarding that project, we have <br />been very active in studying the possible inte- <br />gration of the Homestake Project with the <br />Fryingpan-Arkansas Project. Those studies are <br />going on; no conclusions have yet been drawn; <br />there is nothing specific to report on but they <br />are actively under consideration. <br /> <br />I <br /> <br />On a water right adjudication in District <br />11, preliminary hearings were held at Salida on <br />April 1st, attended by members of the Fryingpan- <br />Arkansas organization and a final hearing on <br />that adjudication is set in the Salida District <br />Court for Septelllber 9th. I think that's the <br />correct date, isn't it, Chuck?" <br /> <br />MR. BEISE: <br /> <br />"That's the next date, yes." <br /> <br />MR. KNIGHTS: <br /> <br />"On the Hayden-Archer 230 kv transmission <br />line, bids will be opened tomorrow in the Chief <br />Engineer's office here in Denver and there I <br />think a word of explanation may be in order to <br />the Board because the handling of that line is <br />a little different than as we normally handle <br />between Regions. In this instance, Region 4 has <br />handled the location, the design data and the <br />acquisition of rights-of-way and will continue <br />on that right-oi-way work for that line. The <br />Chief Engineer, of course, will make the <br />design--has made the designs--and the specifi- <br />cations and calls for the bids. Region 7 will <br />do the construction, supervise the construction, <br />by contract. We have established an office in <br />Cheyenne for that purpose. That office will <br />handle other transmission line construction as <br />well as this one. The construction engineer in <br />Cheyenne is Mr. Greenlaw and in case anyone <br />might be interested in contacting him, I don't <br />have his initials, neither do I have an address <br />for the office in Cheyenne. It was very recently <br />established, within the last week or so. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.