My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02033
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:20 PM
Creation date
10/4/2006 7:08:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />pushing for a rapid progress on the feasibility <br />type studies. <br /> <br />I <br /> <br />On the Green Mountain Afterbay studies, <br />the reconnaissance report there is being drafted. <br />The field work for that reconnaissance report <br />has been done and we are drafting the report <br />itself. That report has the objective of deter- <br />mining whether or not feasibility type investi- <br />gations are warranted. That's the extent of the <br />objective of that particular report. <br /> <br />On the North Republican unit of the Missouri <br />River Basin Project down near Wray, the control <br />surveys which I reported at the last meeting <br />had gotten under way, have now been completed <br />and the topographic surveys of the reservoir <br />site, based on those control surveys, is pre- <br />sently in progress. <br /> <br />That covers the investigations in Region <br />7's portion of Colorado. <br /> <br />Now to go to construction, the first item <br />there would be, of course, our Fryingpan-Arkansas <br />Project in which I know you are all very inter- <br />ested. There we have just moved our Pueblo <br />office and for those of you who may want to <br />visit that office the address is 104 East 7th <br />street in Pueblo. There are, at present, 68 <br />employees - I say at present, this is as of <br />May 1st and today is the 8th - on the project <br />as a whole, 45 of whom are in the field and 23 <br />in the Pueblo office. <br /> <br />I <br /> <br />On the Ruedi investigations, the geologic <br />investigations of the reservoir site itself <br />have been completed and are under analysis. <br />The geologic investigations of the dam sites <br />themselves are under way with concentration of <br />diamond drilling of the dam sites themselves. <br />No analysis, of course, has as yet been made <br />because the data has not yet all been gathered <br />but they are moving ahead very rapidly. The <br />topographic surveys which we contracted by <br />aerial means have been completed and other <br />surveys in the area, such as access roads and <br />
The URL can be used to link to this page
Your browser does not support the video tag.