Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />.721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (~03) 856~3441 <br /> <br />APPENDIX E <br /> <br />STATE OF COLORt\DO <br />~~ <br />(~ <br /> <br />COLORADO W A TfR CONSERV A liON BOARD <br />Department of Natural Resources <br /> <br />o <br /> <br />U <br /> <br />M <br /> <br />Rich,Hd O. lamm <br />Governor <br /> <br />R <br /> <br />N <br /> <br />1-1. <br /> <br />E <br /> <br />M <br /> <br />A <br /> <br />D <br /> <br />I. William McDonald <br />DireCtor <br /> <br />TO: <br /> <br />Members, CWCB <br />Bill McDonald (ild) . <br />November 7, 1984 <br /> <br />David W. Walker <br />Deputy Direc:or <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: Agenda Item 11, November 15, 1984, Board Meeting-- <br />Bear Creek Reservoir space Allocation <br /> <br />Introduction <br /> <br />At its July meeting, the Board asked that I info~m the Omaha <br />District, Corps of Engineers, that it was most anxious to have <br />the Corps reach a final determination on the availability and <br />allocation of space in Bear Creek Reservoir for water <br />conservation storage purposes. The Board also proposed that it <br />take the responsibility for bringing together interested parties <br />to resolve issues concerning the allocation of any available <br />space. <br /> <br />As I reported at the September meeting, the Corps indicated <br />in its response to the Board that a final determination on the <br />availability and allocation of space was awaiting the completion <br />of the Corps' Denver Tri-Lakes System Operations Study. Since <br />the study was not completed prior to the September Board meeting, <br />no further action was taken at that time. <br /> <br />Discussion <br /> <br />We have just this week received preliminary results of the <br />study from the Corps. However, a complete report and final <br />analysis is still being prepared and we have a number of <br />questions about the use and interpretation of the information <br />received thus far. As a consequence, it will not be possible for <br />the staff to prepare a thorough analysis and discussion of the <br />study's results for the Board meeting. <br /> <br />(over) <br />APPENDIX E <br /> <br />214 <br />ai/11 <br />