My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01949
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:07 PM
Creation date
10/4/2006 7:05:14 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/13/2001
Description
Pending and Proposed Legislation - SB 01-157, 2001 CWCB Projects Bill
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />1 state agencies in the impact analysis of the probable maximum flood on <br />2 Cherry Creek reservoir as identified by the probable maximum <br />3 precipitation study of Cherry Creek reservoir. The project is located <br />4 upstream of the Denver metropolitan area. <br />5 (2) The amounts appropriated in this section are in addition to <br />6 amounts appropriated previously for the Cherry Creek reservoir flood <br />7 safety investigation. The moneys appropriated in subsection (1) of this <br />8 section shall remain available for the designated purposes until the project <br />9 is completed. <br />10 SECTION 16. Continuation of the Alamosa river watershed <br />11 restoration project. (1) In addition to any other appropriation, the <br />12 Colorado water conservation board is hereby appropriated one hundred <br />13 fifty thousand dollars ($150,000) from the Colorado water conservation <br />14 board construction fund to continue the Alamosa river watershed project <br />15 with the Alamosa-La Jara water conservancy district or the Alamosariver <br />16 watershed restoration foundation, in the construction of a streambank <br />17 stabilization and riparian habitat improvement project as identified in "the <br />18 conceptual design for the Alamosa river" study. The project is located on <br />19 the Alamosa river from Terrace reservoir to highway 285 near La J ara, in <br />20 Conejos county, Colorado. <br />21 (2) The amounts appropriated in this section are in addition to <br />22 amounts appropriated previously for the Alamosa river watershed project. <br />23 The moneys appropriated in subsection (1) of this section shall remain <br />24 available for the designated purposes until the project is completed. <br />25 SECTION 17. Frenclunan creek feasibility study _ <br />26 appropriation. (1) The Colorado water conservation board is hereby <br />27 authorized to participate in a flood mitigation feasibility study along <br /> <br />-14- <br /> <br />SBOl-l57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.