My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01901
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:34 PM
Creation date
10/4/2006 7:04:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />Riverside Reservoir and Land Comoanv - Riverside Reservoir Soillwav Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @3,75%for20yrs, <br /> <br />County: Weld-NW of Wiggins <br />Project Yield: 200 ac,ft, <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, <br />located 11 miles northwest of Wiggins in Weld County, The State Engineer has placed a storage <br />restriction on the reservoir until an emergency spillway is completed, The Riverside Reservoir and <br />Land Company contracted with W, W, Wheeler and Associates of Denver to prepare construction <br />plans and specifications, The State Engineer's office is currently reviewing the plans with <br />construction scheduled to commence and be completed in 1999, <br /> <br />DeWeese-DYe Ditch and Reservoir Comoanv - DeWeese Dve Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Grape River <br />Terms of Loan: $734,000 @ 4% for 30 years <br /> <br />County: Custer - SW of Canon City <br />Project Yield: 4,020 ac.ft, <br />Project Type: Dam Rehabilitation <br /> <br />This project consists of the replacement of the entire upper 12 feet of the DeWeese Dye <br />dam crest, The new crest section will include reinforcing bar anchors drilled and grouted into the <br />original dam and a new drainage/seepage control system, GEl Consultants, Inc, of Englewood will <br />commence designing the project in late 1998, Construction is scheduled for summer and fall of <br />1999, <br /> <br />Leroux Creek Water Users Association - Carl Smith Dam Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Account <br />Water Source: Leroux Creek <br />Terms of Loan: $300,000 @ 4,0% for 30 years <br /> <br />County: Delta - N of Hotchkiss <br />Project Yield: 750 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This emergency loan project is the re-construction of the Carl Smith Dam, located 15 miles <br />north of Hotchkiss in Delta County, which failed unexpectedly in May 1998, The Leroux Creek <br />Water Users Association has contracted Smith Geotechnical Engineering Consultants of Forth <br />Collins to analyze design alternatives and complete construction plans and specifications, <br />Construction is scheduled for the summer of 1999, <br />
The URL can be used to link to this page
Your browser does not support the video tag.