My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01901
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:34 PM
Creation date
10/4/2006 7:04:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />Ute Water Conservancv District - Plateau Creek Pipeline <br /> <br />Authorization: SB 88-30 <br />Water Source: Grand Mesa Drainage <br />Terms of Loan: $7,600,000 @ 5% for 30 years <br /> <br />e <br /> <br />County: Mesa - E of Palisade <br />Project Yield: 7,200 ac,ft, <br />Project Type: Pipeline Construction <br /> <br />This project is the replacement of an existing IS-mile pipeline providing water to the Ute <br />Water Conservancy District. The District provides water to 55,000 people, or more than half of the <br />Grand Valley population, The Environmental Assessment was heavily scrutinized by the Fish and <br />Wildlife Service relative to the Recovery Implementation Program along the IS-mile reach, This <br />analysis has resulted in the Bureau of Land Management (the lead federal agency) requiring an <br />Environmental Impact Statement be prepared before federal approval can be granted, The Record <br />of Decision regarding the EIS was completed in June 1998, Camp, Dresser, & McKee, Inc, of <br />Denver is currently preparing the project design for a construction commencement in late 1998, <br /> <br />San Luis Vallev Canal Companv - Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Rio Grande River <br />Terms of Loan: $188,000 @3,75%for30years <br /> <br />County: Rio Grande - E of Monte Vista <br />Project Yield: 25,000 ac,ft, <br />Project Type: Diversion Structure Rehab, <br /> <br />. <br /> <br />This project is the rehabilitation of the San Luis Valley Canal Company's Rio Grande River <br />diversion structure, The project is located in Rio Grande County, 3 miles east of Monte Vista, The <br />AIamosa office of the Natural Resource Conservation Service has prepared the design plans with <br />the CWCB staff preparing the construction contract documents, Due to unexpected expenditures in <br />1998, the Company has postponed construction of the project until the fall of 1999, <br /> <br />Highland Ditch Companv - Foothills Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98-1198 - Severence Tax <br />Water Source: St. Vrain River <br />Terms of Loan: $1,040,000 @4,O% for 30 years <br /> <br />County: Boulder - W ofLongmont <br />Project Yield: 450 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in <br />Boulder County, The dam has an inadequate spillway and severe seepage through the embankment <br />and has had a storage restriction placed on it by the State Engineer. The Highland Ditch Company a <br />has contracted with Smith Geotechnical Engineering Consultants of Fort Collins to analyze design - <br />alternatives and complete construction plans and specifications, Construction is scheduled to <br />commence in the fall of 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.