Laserfiche WebLink
<br />Greelev and Loveland Irrigation Companv - Horseshoe Dam #2 Outlet Rehabilitation <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Big Thompson River <br />Terms of Loan: $75,000@4,21%for30yrs, <br /> <br />County: Larimer - NE of Loveland <br />Project Yield: 8,051 ac,ft, <br />Project Type: Dam Outlet Rehabilitation <br /> <br />. <br /> <br />This project is the rehabilitation of the Horseshoe Dam #2 outlet structure, located just <br />northeast of Loveland in Larimer County, The outlet became inoperable in May 1998 and has been <br />temporarily blocked shut since then, The Greeley and Loveland Irrigation Company has contracted <br />with Boyle Engineering Corporation of Lakewood to analyze design alternatives and complete <br />construction plans and specifications. Construction is scheduled to commence in the late fall of <br />1998 with completion scheduled for the spring of 1999, <br /> <br />Wood Lake Mutual Water & Irrigation Companv - Wood Lake Dam Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Cache la Poudre River <br />Terms of Loan: $188,000 @3,75% for 30 years <br /> <br />County: Weld - W of Eaton <br />Project Yield: 3,106 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />. <br /> <br />This project is the replacement of the Wood Lake Dam outlet works including all control <br />structures, installation of a toe drain, raising the existing saddle dam, and construction of a spillway <br />to pass the 50% Probable Maximum Precipitation flood, The need for the improvements is a result <br />of the State Engineer's Office dam safety requirements, Smith Geotechnical, Inc, of Fort Collins <br />commenced design in late spring 1998, Construction is scheduled for early spring and summer of <br />1999, <br /> <br />Boulder & Lefthand Irrigation Companv - Twin Lakes Outlet Improvements <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: Boulder Creek <br />Terms of Loan: $50,000 @3,75%for 15 years <br /> <br />County: Boulder - NE of Boulder <br />Project Yield: 218 ac,ft, <br />Project Type: Dam Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures, Recent State Engineer Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete, Rocky Mountain Consultants of _ <br />Longmont are currently preparing the improvement design with construction scheduled for the . <br />spring of 1999, <br /> <br />- <br />