My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01901
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:34 PM
Creation date
10/4/2006 7:04:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. <br /> <br />. <br /> <br />North Poudre Irrigation Companv - VariOllS Pipeline and Dam Improvements <br /> <br />Authorization: SB 98-1189 <br />Water Source: Cache la Poudre <br />Terms of Loan: $500,000 @4,03% for 20 years <br /> <br />County: Larimer- W of Wellington <br />Project Yield: 11,973 ac,ft, <br />Project Type: Dam and Pipeline Rehab, <br /> <br />This project is the rehabilitation of several North Poudre system facilities, The <br />rehabilitation projects include: I,) Spillway construction at North Poudre Reservoir #5, 2,) Pipeline <br />construction at the North Poudre Reservoir #6 outlet. 3,) Pipeline construction along North <br />Poudre's Buckeye lateral, Smith Geotechnical, Inc, of Fort Collins is currently preparing the <br />design plans with construction scheduled for the fall of 1998 on the Reservoir #6 project. Future <br />construction schedules have not yet been determined. <br /> <br />Summit Reservoir and Irrigation Companv - Summit Reservoir and Ditch Svstem Rehab, <br /> <br />Authorization: SB 97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,000 @ 3,75% for 30 years <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac,ft, <br />Project Type: Reservoir and Ditch Rehab, <br /> <br />This project is the rehabilitation of the Summit Reservoir Dam outlet works and the <br />construction of repairs and improvements to the Summit Reservoir and Irrigation Company's water <br />collection and distribution facilities, The Cortez office of the Natural Resource Conservation <br />Service is preparing the construction plans and specifications with construction scheduled for the <br />winter and spring of 1999, <br /> <br />Western Mutual Ditch Comoanv - Check Dam Rehabilitation <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $100,000 @ 3,75% for 20 years <br /> <br />County: Weld - NW ofPlatteville <br />Project Yield: 20,000 ac,ft, <br />Project Type: Check Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Western Mutual Ditch Company's South Platte <br />River check dam across the river from their diversion structure, The check dam creates a backwater <br />along a river side-channel created by an island on the south side of the river, and diverts the flow to <br />the Company's diversion structure on the north side of the river. The project is located in Weld <br />County, 2 miles northwest of Platteville, Rocky Mountain Consultants of Longmont has prepared <br />the design plans and construction contract documents, Construction is scheduled to commence in <br />in late 1998, depending upon receipt of access approvals, and will be completed in 1999, <br />
The URL can be used to link to this page
Your browser does not support the video tag.