Laserfiche WebLink
<br />Pinon Mesa Ranches Community Association - Rural Raw Water Svstem Construction <br /> <br />Authorization: SB 97-008 <br />Water Source: Florida River <br />Terms of Loan: $258,000 @ 3,75% for 30 yrs <br /> <br />County: La Plata - W ofIgnacio <br />Project Yield: 125 ac,ft, <br />Project Type: Diversion and Dist. System <br /> <br />e <br /> <br />This $345,000 project is the construction of a new rural raw water irrigation and distribution <br />system in La Plata County west of Ignacio, The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion <br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br />from the storage impoundment to the water usets, RMI Environmental Services of Farmington, <br />New Mexico prepared the project design. Project construction commenced September 2, 1997 by <br />RMI Environmental Services of Farmington, New Mexico (a designlbuild contractor), The project <br />is currently 70% complete and continues to be on indefinite hold due to and financial problems, <br /> <br />Fort Mor~an. City of - NCWCD Southern Pipeline Extension <br /> <br />Authorization: SB94-029, SB98-1l89, Svrnce Tax <br />Water Source: Colo,-Big Thompson/Windy Gap <br />Terms of Loan: $5,500,000 @ 4% for 40 years <br />$8,000,000 @ 4% for 30 years <br /> <br />County: WeldIMorgan- W ofFt, Morgan <br />Project Yield: 6,877 ac,ft, <br />Project Type: Pipeline Construction <br /> <br />e <br /> <br />This project is an extension of the Northern Colorado Water Conservancy District's <br />Southern Pipeline Project. The pipeline extension will provide high quality western slope water to <br />the City of Fort Morgan for their municipal use, Montgomery Watson, Inc, of Denver completed <br />the project design, from the HudsonlFt. Lupton extension at Platteville, to the Fort Morgan area, in <br />June. The construction contract was awarded to BRB Contractors, Inc, of Topeka, Kansas and <br />construction commenced September 1, 1998, Project completion is scheduled for late 1999, <br /> <br />Proiects Under Desien <br /> <br />Julesburg Irrigation District - Harmonv Ditch # I Diversion Structure Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Repair Acc, County: Logan - SW of Crook <br />Water Source: South Platte River Project Yield: 40,000 ac,ft, <br />Terms of Loan: $590,000 @ 3,75% for 30 years Project Type: Diversion Rehabilitation <br /> <br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony <br />Ditch #1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br />Julesburg Reservoir, Zoyiopoulos & Associates of Greeley is preparing the design plans for an <br />early December 1998 construction start, Construction is scheduled for completion by late March <br />1999, <br /> <br />e <br />