My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01901
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:34 PM
Creation date
10/4/2006 7:04:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />Lefthand Ditch Companv - Rehabilitation of Leftband VaIlev Reservoir <br /> <br />Authorization: HB 95-1155 <br />Water Source: Lefthand Creek <br />Terms of Loan: $560,000 @ 4,5% for 30 years <br /> <br />County: Boulder - N of Boulder <br />Project Yield: 1,624 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This project is the result of the State Engineer's order to increase the spillway capacity of <br />the Lefthand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br />downstream structures, The project includes the replacement of the current spillway with a larger <br />roller compacted concrete spillway and stilling basin, Rocky Mountain Consultants of Longmont, <br />Colorado completed the permitting process, design engineering and preparation of construction <br />contract documents, The construction contract was awarded to Gears, Inc, of Crested Butte and <br />construction commenced September I, 1998, The project is currently 75% complete with <br />completion scheduled for January 1999, <br /> <br />Buffalo Mutual Irrigation Companv - Buffalo MuruaI Irrigation Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $378,750 @ 3,75% for 30 yrs <br /> <br />County: Prowers - E of Lamar <br />Project Yield: 17,560 ac,ft, <br />Project Type: Diversion Structure <br /> <br />This $325,000 project is the re-construction of the Buffalo Mutual Irrigation Company's <br />diversion structure and headgate on the Arkansas River in Prowers County 17 miles east of the City <br />of Lamar, Wright Water Engineers of Denver, Colorado completed project design and preparation <br />of construction contract docnments, The construction contract was awarded to TLM Constructors, <br />Inc, of Swink, Colorado and construction commenced September 21,1998, The project is currently <br />50% complete with completion scheduled for JanUlll)' 1999, <br /> <br />Greelev and Loveland Irrigation Companv - Equalizer Dam Rehabilitation <br /> <br />Authorization: SB 98-Il89 <br />Water Source: Big Thompson River <br />Terms of Loan: $308,000 @4.2l%for30years <br /> <br />County: Larimer - E of Loveland <br />Project Yield: 885 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Greeley & Loveland Irrigation Company's Equalizer <br />Reservoir located east of Loveland, The project includes replacement of the dam outlet gate with a <br />new structure, which will incorporate both the outlet gate and a spillway, The existing dam <br />embankment will also be raised almost four feet. ECI Consultants, Inc, of Englewood prepared the <br />construction plans and specifications with the construction contract recently awarded to Schmuesor <br />and Associates, Inc, of Wheatridge, CO, Construction will commence on or before November 16, <br />1998 with completion scheduled for the spring of 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.