<br />generators and other electrical works, is <br />about 89 percent completed, money-wise. Unit <br />5 is scheduled to go on the line in May. <br /> <br />I <br /> <br />On Flaming Gorge Reservoir, powerplant, <br />and dam, very little construction has been <br />going on at that location. It is essentially <br />completed and this powerplant has operated at <br />full capacity through this winter. <br /> <br />On the Curecanti Unit, on the Blue Mesa <br />Dam during the past report period, excavation <br />has continued on the river channel. There has <br />been some work on the installation of equip- <br />ment and other mechanical installations. It <br />is expected that the concrete work will con- <br />tinue and be accelerated in April. We hope <br />to start in with some of the work of placement <br />of earth materials, particularly the pervious <br />materials, in the zone 2 and 3 materials, this <br />month. The structure now is about 70 feet <br />above the river level, that is, as far as the <br />zone 1 impervious material is concerned. <br /> <br />Going on to Morrow point, the excavation <br />has been completed in the switchyard and power- <br />plant access tunnel. Open-cut excavation for <br />the powerplant, including the tailraces, and <br />the keyways for the dam, continued during <br />February and March and the contractor has begun <br />excavation on the powerplant chamber. It is <br />expected that he will get into concreting <br />operations about this July. Overall, the <br />keyway and foundation excavations are about <br />75 percent completed. <br /> <br />I <br /> <br />You people who have followed the progress <br />of this dam in the papers, know that we had a <br />serious accident at this site within the last <br />two weeks' time. This was caused by a snow- <br />slide that originated about 500 feet in <br />elevation above the dam proper. Unfortunately <br />there was one fatality and two other men were <br />injured slightly. Immediately after this acci- <br />dent a survey was made of the area and within <br />approximately three days' time working opera- <br />tions were resumed at this site. <br />