Laserfiche WebLink
<br />MR. VANDEMOER: <br /> <br />MR. STAPLETON: <br /> <br />MR. CORNELIUS: <br /> <br />MR. STAPLETON: <br /> <br />MR. JENNINGS: <br /> <br />order, to pass a resolution directing the <br />Diredtor to write Mr. Greer expressing our <br />appreciation for our coritacts to wotk with him <br />in the past and our appreciation for the fine <br />cooperation he has shown this Board, with per- <br />haps a letter to Mr. Dugan to include in his <br />personnel file. I know Mr. Greer is excitedly I <br />awaiting his new challenge but we will miss <br />our contact with him. So if the Board feels <br />so inclined, I would entertain a motion to <br />that effect." <br /> <br />"I so move..e. <br /> <br />"It has been moved." <br /> <br />III second.1I <br /> <br />"And seconded. All those in favor will <br />signify by saying 'aye'; opposed - unanimously <br />carried. <br /> <br />The next will be a report from Bob <br />Jennings of Region 4. Bob." <br /> <br />"Thank you. Mr. Chairman, members of the <br />Board, ladies and gentlemen, as you can see <br />from the formal report filed in your folders, <br />my report will consist of three parts - Con- <br />struction, Reservoir Operations and Investi- <br />gations, and a short note with reference to <br />our small project activities. <br /> <br />It seems that we can't have favorable <br />weather for construction as well as getting <br />our reservoirs filled. In the last two <br />months' time since our last meeting, the <br />weather has been particularly favorable for <br />good runoff, but not too favorable for construc- <br />tion. However, the contractors are getting <br />organized and it looks like we can look forward <br />to a very active construction season. <br /> <br />I <br /> <br />Specifically, at Glen Canyon we have four <br />of the eight generators in operation. The <br />completion contractor, the contractor respon- <br />sible for installation of the turbines, <br />