My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01820
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:43 PM
Creation date
10/4/2006 7:03:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/14/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~"''''~ <br /> <br />MR. STAPLETON: <br /> <br />MR. ECKLES: <br /> <br />advance planning. Our three projects in the <br />advance planning stage are the Bostwick Park <br />project, Fruitland Mesa project and the Savery- <br />Pot Hook project. On the Bostwick Park project <br />we have initiated our advance planning studies <br />and we have also initiated repayment negotia- I <br />tions with the Bostwick Park Conservancy Dis- <br />trict. This repayment negotiation has consisted <br />principally to date of working with three of <br />the canal companies who will be the basic con- <br />tracting entity. We have worked out a consoli- <br />dation with these canal companies so we will <br />only have one entity to deal with rather than <br />three separate canal companies. <br /> <br />On the Fruitland Mesa project our advance <br />planning work has been principally securing <br />aerial topography which will be necessary and <br />essential for our further studies. Savery- <br />Pot Hook studies will not be initiated until <br />F. Y. 1966, if funds then become available. <br /> <br />Our small reclamation project program, <br />consisting of a project with the Orchard City <br />Irrigation District is virtually completed. <br />There yet remains a little cleanup work to do <br />and that sort of thing. The work was completed <br />well within the estimates; in fact, a small <br />amount of money was left over and we are present- <br />ly negotiating with that district to put in a <br />small amount of canal lining. <br /> <br />Another activity that the Bureau of Recla- <br />mation has on t~e western slope has consisted <br />of establishing the first Job Corps camp in <br />the state of Colorado. The camp is being es- <br />tablished at Collbran. We anticipate that we <br />will receive the first enrollees for this camp <br />late this month, probably about the 27th. <br /> <br />I <br /> <br />That co~pletes my report, Mr. Chairman. <br />If there are any questions, I'll be happy to <br />try and anSWGr then." <br /> <br />"Thank you, Dob. Mr. Eckles." <br /> <br />"Mr. Jennings, you reported some small <br />
The URL can be used to link to this page
Your browser does not support the video tag.