Laserfiche WebLink
<br />In 1997 a significant landslide removed approximately 250-fl. of the Woodchuck Ditch. Since that time the Ditch , <br />Company has spent significant time and money in temporary repairs to keep the ditch operational. In 1999 the Natural.- <br />Resources Conservation Service (NRCS), Steamboat Springs Office, was retained by the Ditch Company to design a _ <br />permanent solution to the problem. The proposed improvements include 400-fl. of 36-inch diameter heavy wall steel <br />pipe secured with %-inch wire rope anchored into bedrock, with inceptor drains, backfilled as required to restore the <br />natural side slope of the area. Percision Construction has commenced work and is anticipated to be completed by the end <br />of November 2000. <br /> <br />Projects Under Design <br /> <br />1. Windsor Reservoir and Canal Company - Various Canal and Reservoir Rehabilitations <br />Authorization: SB 96-153 County: Larimer- N. of Ft. Collins <br />Water Source: Cache La Poudre Project Yield: 30,000 ac. fl. <br />Terms of Loan: $2,357,000 @4.15% for 30 years Project Type: CanallRes. Rehabilitation <br /> <br />In 1995 the Windsor Reservoir and Canal Company retained the services of Smith Geotechnical to evaluate the <br />current condition of their 25 miles of canal and 6 reservoirs. Smith Geotechnical identified approximately $3,400,000 in <br />recommended improvements, with a proposed design and construction time frame of 15-years. The projects identified <br />consisted of the Poudre Valley Canal, Cobb Lake Pipeline and Outlet/Inlet Structures, Windsor Reservoir No.8, Annex <br />No.8 and Elder Reservoir Outlet Structure. The Poudre Valley Canal and the Cobb Lake improvements have been <br />designed and constructed. The design on Annex No.8, Windsor No.8 and Elder Reservoir are currently underway, with <br />construction planned to commence in the fall of 2000. Construction may consist of I, 2 or all 3-reservoir projects, <br />depending on the direction of the Ditch Company. <br /> <br />2. Ryan Gulch Reservoir Company - Ryan Gulch Dam Rehabilitation <br />Authorization: SB 99-173 County: Larimer - S. of Loveland <br />Water Source: Big Thompson River Project Yield: 645 ac.fl. <br />Terms of Loan: $317,500 @4.25%for 30 years Project Type: Dam Rehabilitation <br /> <br />e <br /> <br />This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of a new spillway, <br />lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch otttlet pipe, and constructing a new <br />upstream controlled inlet works. Boyle Engineering, Inc. of Denver has completed the final design plans, which are <br />currently under review at the State Engineer's Office. Construction is scheduled to commence in November of 2000. <br /> <br />3. People Ditch Company - People Ditch Diversion Structure Rehabilitation <br />Authorization: Small Project Loan Cottnty: Logan - N.E. of Sterling <br />Water Source: SOttth Platte River Project Yield: 1,200 ac.fl. <br />Terms of Loan: $43,000 @3.75% for 20 years Project Type: Diversion Structure <br /> <br />The People's Ditch Company historically diverted irrigation water from the South Platte River at an existing <br />diversion point located approximately 6 mjles northwest of the Town of Sterling. This existing diversion structure was <br />damaged during the flood of 1995 and was entirely washed Ottt in 1997. The proposed project is to construct a new <br />diversion structure along the Bravo Ditch, therefore eliminating the need for the existing structure, and then construct <br />approximately 1050 l.f. of 24" pipeline to transport the flow from the Bravo Ditch back to Peoples Ditch. Bravo Ditch <br />has agreed to allow People Ditch to convey their decree flows through their ditch system and then divert it back to the <br />existing People Ditch by means of the new diversion structure. The project is tentatively scheduled to commence <br />construction at the end of November, 2000. <br /> <br />4. Tunnel Water Company - LaramieIPoudre Tunnel Rehabilitation <br />Authorization: Emergency Loan County: Larimer - W. of FI. Collins <br />Water Source: Laramie River Project Yield: 15,085 ac. fl. <br /> <br />e <br />