My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01778
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 11:51:17 AM
Creation date
10/4/2006 7:02:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
Directors' Reports
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Source: Chicago Creek Project Yield: 230 acre feet <br />Terms of Loan: $955,000 @ 4.75% for 10 yrs. Project Type: Reservoir Rehabilitation <br /> <br />e In 1998 the State Engineer's Office restricted the storage height of the reservoir to be 9-ft. below the crest of the <br />dam, reducing the storage capacity from 230 acre-ft. to 120 acre-ft. The storage restriction was due to excessive seepage <br />and the poor condition of the spillway. Harrison Western Construction, and designlbuild group out of Denver, Colorado, <br />was retained by the Town to design and construct the necessary improvements to restore the dam to its original storage <br />capacity of 230 acre-feet. The proposed improvements inclttde, constructing a compacted earthfillliner on the upstream <br />slope of the reservoir and floor, construct new toe drains, raise the embankment dam crest by 2.5-ft., place rip rap and <br />liner protection material above the earthfillliner, spillway repairs, and fill the old borrow pit within the reservoir. <br />Harrison Western Construction has commenced construction in rehabilitating the dam face and will continue working as <br />weather permits. <br /> <br />8. Plumb and Dailey Ditch Company - Boulder Creek Diversion Structure Rehabilitation <br />Authorization: Small Project Loan County: Weld - E. of Boulder <br />Water Source: Boulder Creek Project Yield: 2,278 acre feet <br />Terms of Loan: $42,000 @ 3.75% for 20 yrs. Project Type: Diversion Structure <br /> <br />This project is the rehabilitation of the Plumb and Dailey Ditch Company's diversion structure on Boulder Creek, <br />which has deteriorated due to age to the point of replacement. The replacement structure, designed by Natural Resources <br />Conservation Service, Greeley Office, consists of a new 48-ft.long concrete diversion structure, with 8 - 6'x2'raised <br />gates, and a 25-ft. long downstream grouted rip rap spill basin. Concrete Structures, out of Longmont, Colorado, has <br />commenced construction and is anticipated to be completed by the end of November, 2000. <br />9. Highland Ditch Company - Foothills Reservoir Dam Rehabilitation <br />Authorization: SB 98-1198 - Severance Tax County: Boulder - W of Longmont <br />Water Source: St. Vrain River Project Yield: 450 ac.ft. <br />_Terms of Loan: $1,040,000 @ 4.0% for 30 yearsProject Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in Bottlder County. The <br />dam has an inadequate spillway and severe seepage through the embankment and has had a storage restriction placed on <br />it by the State Engineer. The final design plans and specifications were prepared by Smjth Geotechnical Engineering <br />Consultants of Fort Collins Colorado. The proposed improvements include a new spillway, a sand filter blanket along the <br />downstream face of the dam, a perimeter toe drain with flow measuring devices, rip rap placement along the upstream <br />face of the dam, and reconstructing the dam crest. The project was awarded to Zak Dirt, out of Longmont, Colorado, <br />who is tentatively scheduled to commence construction in NovemberlDecember 2000. <br /> <br />10. Pine River Canal Company - Pine River Canal Rehabilitation at Tunnel Hill <br />Authorization: SB 99-173 Cottnty: La Plata - SE of Ignacio <br />Water Source: Pine River Project Yield: 71 ,000 acre feet <br />Terms of Loan: $243,700 @ 3.5% for 20 yrs. Project Type: Canal Rehabilitation <br /> <br />This $350,000 project is the rehabilitation of the Pine River Canal at the Tunnel Hill site, located 8 mjles <br />southeast of Ignacio. The project consists of replacing a water supply tunnel in poor condition, with approximately 700 <br />lineal feet of 72-inch diameter concrete pipe, bypassing the tunnel completely. The Natural Resource Conservation <br />Service has completed the design plans with CWCB staff completing the construction bid documents. The Pine River <br />Canal Company has retained the services of Gosney and Sons, from Bayfield, Colorado, to construct the project. The <br />project area has been cleared and prelimjnary construction staking has been completed. Project is anticipated to be <br />completed by February 200 I. <br /> <br />II. Woodchuck Ditch Company - Ditch Rehabilitation <br />el;uthOrization: Small Project Loan County: Routt - N.W. Steamboat Springs <br />Water Source: Soda/G unn Creeks Project Yield: 1,250 acre feet <br />Terms of Loan: $40,000 @ 3.75% for 20 yrs. Project Type: Ditch Rehabilitation <br />
The URL can be used to link to this page
Your browser does not support the video tag.