My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01764
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:48 PM
Creation date
10/4/2006 7:02:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/16/1960
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. STAPLETON: <br /> <br />MR. BARKLEY: <br /> <br />they need to. be read - I'll be happy to do it for <br />the infarmation of the people who are here who <br />do not have copies, if yau wish it done. The <br />Baard members have the recommendations as set <br />forth." <br /> <br />I <br /> <br />"I think they should be read. There are <br />some peaple here whom I am sure wauld like to <br />hear them. You are talking abaut the recommend- <br />ations ?" <br /> <br />"Just the recommendations only, on the final <br />page, Mr. Chairman. The Commission makes the <br />follawing recommendations: <br /> <br />'l. That the State of Colorado vigorausly <br />press a demand..that the Secretary 'of the Inter- <br />ior declare the States of the Upper Division of <br />the Calorado River as the primary market area <br />for Colorado. River Storage Project'power. <br /> <br />2. That the State of Colorado urges the <br />Secretary of Interior to. make final allocation <br />af the Storage Project power among the Upper <br />Division States and that Calorado be allocated <br />not less than 535 megawatts; that in 1970 not <br />less than 170 megawatts be made available to. <br />Colorado; that in 1975 not less than 375 mega- <br />watts be made available to. Colorado; and that <br />in 1980 nat less than 535 megawatts be made <br />available to Colorado.. <br /> <br />3. The extent of the transmission system <br />be such that integration af operation of the <br />power plants af the Storage Project and ather <br />federally owned projects be effected, and that <br />the transmission system be extended as near to <br />preference user laad centers as economic con- <br />siderations will permit. <br /> <br />4. The Secretary af the Interior be urged <br />to make available at the earliest date the in- <br />terim schedule of rates applicable to the sale <br />and dispasition of Storage Project Power. <br /> <br />I <br /> <br />5. That this power committee remain an a <br />stand-by basis to meet an call of the Chairman <br />to review transmission system praposals as they <br />are presented.' <br /> <br />I would only add this, Rtr. Chairman, that <br />perhaps there are questians by members of the <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.