My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01762
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:45 PM
Creation date
10/4/2006 7:01:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/14/1959
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1345 <br /> <br />I <br /> <br />project was completed and submitted to our Washington and <br />Denver offices in December for their review and approval. <br />The project plan described therein is generally the same <br />plan presented to Congress in the authorizing hearings except <br />that the project acreages have been reduced by the elimina- <br />tion of class 4 lands and that additional costs have been in- <br />cluded for project drains and for an operation and maintenance <br />headquarters building. <br /> <br />Curecanti Unit. <br /> <br />The proposed report is nearing completion. As pre- <br />viously discussed the time available to us did not permit <br />an appraisal in final detail for the Cyrstal site. Therefore" <br />our current report will present detailed plans for Blue Mesa <br />and Morrow Point Dams and Reservoirs only. We plan to follow <br />up in about a year with a supplemental report showing the <br />costs and benefits of adding Crystal Dam and Reservoir. A <br />contract will need to be awarded early this summer to obtain <br />the additional detailed topography needed for selecting and <br />appraising the Crystal site. <br /> <br />It is our present plan to complete the intial re- <br />port early in February. <br /> <br />Florida Proiect. <br /> <br />Core drilling was completed on the lower (No.2) <br />Lemon Dam site. Overburden conditions were found to be con- <br />siderably more favorable at this site than at the upper site; <br />however, solution channels in some areas of the limestone <br />abutments will create design problems. Land classification <br />and water supply phases of the investigation are essentially <br />complete and we are just starting design and estimates work <br />on the project features. <br /> <br />Savery-Pot Hook Proiect. <br /> <br />The feasibility report has been delayed for minor <br />revisions primarily with respect to manner of reporting. <br />No investigation work is involved which would delay the re- <br />submission. <br /> <br />I <br /> <br />Pine River Proiect Extension. <br /> <br />We have been asked by our Washington office to sup- <br />ply additional information for their review of the report. <br />We will forward copies of the report for your consideration <br />as soon as it is released. <br /> <br />Other Proiects. <br />The progress on the other projects under investigation <br />
The URL can be used to link to this page
Your browser does not support the video tag.