<br />I <br /> <br />I <br /> <br />e~l <br /> <br />work is being deferred until further study can be given to <br />the foundation problems at the Rifle Gap Dam site. The Chief <br />Engineer is now preparing a reconnaissance estimate for the <br />dam to be used in reappraising the feasibility of the project <br />and the need, if any, for revising the dam plan. <br /> <br />Florida Project <br /> <br />Here again we are faced with foundation problems at <br />the Lemon Dam Site. Drilling last fall indicated that bedrock <br />was considerably deeper and the foundation was more pervious <br />than anticipated in previous studies. As soon as weather per- <br />mits, a new dam site slightly downstream will be mapped and <br />drilled. Land classification and water supply studies are <br />going forward. <br /> <br />Savery-Pot Hook Project <br /> <br />The necessary reV2S2onS have been made in cost esti- <br />mates, benefits, and repayment studies and the report is now <br />being processed. Upon field completion, the report will be for- <br />warded to our Commissioner's office for approval and circulation <br />for the 90-day review and comments as outlined under the Flood <br />Control Act. <br /> <br />Fruitland Mesa Project <br /> <br />Field surveys are essentially completed. Work is now <br />being done in the selection of project plan and the lands to be <br />served and the development of the project water supply. Comple- <br />tion of the feasibility report has been delayed some because of <br />priority given to the Savery-Pot Hook report and to restrictions <br />in shifting F. Y. 1958 funds. This report is scheduled for <br />early F. Y. 1959 <br /> <br />Bostwick Park Project <br /> <br />The foundation conditions at the Silver Jack Dam site <br />on Cimarron Creek were determined in recently completed drilling <br />to be satisfactory for the proposed structure. Land classifi- <br />cation surveys are complete and plan formulation and water sup- <br />ply studies are going forward. Possibilities for supplying muni- <br />cipal water to the City of Montrose are also being considered. <br />Completion of the feasibility report is still scheduled for mid <br />F. Y. 1959. <br /> <br />Dolores Project <br /> <br />A contract for photogrammetric mapping of the lands <br />not previously mapped (about 50 percent of the project area) was <br />