My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01700
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:59 PM
Creation date
10/4/2006 7:01:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/1961
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LbbU <br /> <br />federal government states that the state of <br />Colorado will put up $100,000 over a two-year <br />period of time. $50,000 of that we have al- <br />ready furnished. The remaining $50,000 will <br />depend upon an appropriation by the Legislature <br />this coming session. The federal government <br />will put in something like $300,000 on this <br />investigation. <br /> <br />There are particular items, to go down <br />the projects rapidly. On the San Miguel we <br />have an engineer that has been assigned to the <br />Bureau office at Durango. He was originally <br />assigned on the Animas-La Plata Project and <br />will continue there until July 1st of this com- <br />ing year to work on the San Miguel Project. <br />The amount shown under the San Miguel Project <br />reflects his salary. The Narrows I have al- <br />ready covered. The Fryingpan-Arkansas-Basalt <br />is a conjecture on our part. It depends upon <br />the reconnaissance study which will be pub- <br />lished by the Bureau during this forthcoming <br />year. The Power Transmission will be, for the <br />most part, for consulting engineers in connec- <br />tion with the power transmission problem. <br /> <br />Let me retreat here. We have nothing <br />budgeted for the Fryingpan-Arkansas-Basalt as <br />such this year. I was looking at last year. <br /> <br />I <br /> <br />On the Grand Mesa we have the sum of <br />$15,000. Again that will depend upon the recon- <br />naissance surveYs that are now being undertaken <br />by the Bureau of Reclamation. Reports will be <br />released and made public on that sometime dur- <br />ing the coming year. In connection with the <br />Grand Mesa we are also considering Battlement <br />Mesa. It may be necessary to give some <br />assistance to the Battlement Mesa program. As <br />you will remember, on July 1st of this coming I <br />year we will start on two new projects - Battle- <br />ment Mesa and the Bluestone Projects. <br /> <br />The ~unnison River Basin is part of our <br />comprehensive state-wide survey that we started <br />and have now completed in the San Juan Basin. <br />Now we are moving up to the Gunnison River Basin <br />
The URL can be used to link to this page
Your browser does not support the video tag.