My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01700
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:59 PM
Creation date
10/4/2006 7:01:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/1961
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lt>14 <br /> <br />on that project. Also we are quite well <br />pleased on the progress the' contractor has <br />made on the Florida project. As far as the <br />Collbran project is concerned all of the irri- <br />gation features of that project have been com- <br />pleted and we operated this year under a test- <br />ing and seasoning program. We delivered I <br />approximately 11,000 acre-feet of water to <br />the water users and exchanged between 4,000 <br />and 5,000 acre-feet of water for power gen- <br />eration purposes. The severe storm that we <br />had over the Labor Day week-end and rather <br />inclement weather that we have had since then <br />has delayed us on this project. The contrac- <br />tor,on Grand Mesa who is, working at elevations <br />between 9,500 and 10,500 feet, has had a <br />serious setback because of this weather. <br /> <br />In advance planning, we hope to have the <br />Silt definite plan report out in October. <br />The. supplemental report on the Crystal Dam <br />of the Curecanti Unit is also scheduled out <br />in October. <br /> <br />I think Larry has mentioned something <br />about these feasibility reports. We have <br />those about on schedule. I don't see any <br />mention of the Yellow Jacket Project which <br />.is one that we have initiated this year and <br />activities to date have been limited princi- <br />pally to water supply studies. We have <br />initiated plan formulations and are working <br />with the Districts on conflicting water rights <br />and those things. <br /> <br />, <br />Coming to reconnaissance investigations, <br />we have the Grand Mesa Project as well as the <br />Ruedi Western Slope investigation. We have <br />given precedence to the Grand Mesa Project <br />and we hope to come out with a reconnaissance <br />report on that about the first of the calen- <br />dar year and Ruedi is scheduled immediately <br />behind that.. The Juniper Project reconnais- <br />sance is scheduled for this September. I <br />think there will be a slight delay of a month <br />or two on that. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.