My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01698
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:57 PM
Creation date
10/4/2006 7:01:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/14/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />bedding and riprap operations continued on the <br />outlet works channel. <br /> <br />The contractor on the major portion of the <br />county Road No. 104 relocation and improvement I <br />had completed 86.9 percent of the contract with <br />45.4 percent of the contract time elapsed. <br />pioneer excavations are complete on the road <br />and good progress is noted on the Fryingpan <br />River Bridge. <br /> <br />The contractor for clearing and fencing <br />at Ruedi Reservoir had completed 42.7 percent <br />of the contract with 16.0 percent of the contract <br />time elapsed. Clearing operations are well <br />under way, and the contractor began removing <br />structures from the reservoir area late in the <br />period. <br /> <br />The transmission work on the Upper Colorado <br />River storage project which is the Poncha-~tidway <br />section of the Cure cant i-Midway 230-kv trans- <br />mission line is about 55 percent complete in <br />about 35 percent of the time and the contractor <br />has shut down for the winter. placement of <br />concrete for tower footings on the east half of <br />the line is complete. The contractor has re- <br />ceived all conductor and insulator assemblies <br />for the entire line. Delivery of tower steel <br />is about 50 percent complete. <br /> <br />We have previously reported to you on the <br />Trinidad project in the progress that we have <br />made in negotiating a repayment contract for <br />the conservation space in Trinidad Reservoir. <br />This has been a difficult piece of work, in- <br />volving subcontracts with the ditch companies <br />to receive varying amounts of water and varying <br />benefits, but I am happy to report that we seem I <br />on the threshold of completing that contract. <br />The Board of the Purgatoire River Water Conser- <br />vancy District has executed an agreement with <br />the Hoehne Ditch company and this completes the <br />negotiations with the major ditch companies in- <br />volved in the project. There are a few minor <br />ditches at the lower end of the project that <br />
The URL can be used to link to this page
Your browser does not support the video tag.