Laserfiche WebLink
<br />interests. The report is being finally pre- <br />pared for duplication and we hope to have that <br />out in the near future for final review and <br />processing. The comments on the report were <br />generally favorable and we did not have a great <br />deal of work to do to revise the draft of the <br />report to acknowledge those comments. <br /> <br />I <br /> <br />On the upper South Platte Unit, Missouri <br />River Basin project, geology studies were com- <br />pleted at the Turkshead Dam site and at repre- <br />sentative l-mile sections of access roads and <br />road relocations. Geology studies were con- <br />tinued at the Two Forks Dam site. A start was <br />made on drilling of the Hudson Dam site but was <br />suspended because the equipment was needed on <br />another job. <br /> <br />All contracted topographic maps and cross <br />sectional data for Two Forks Dam site were com- <br />pleted. <br /> <br />The Bureau of Mines report on the Two Forks <br />Reservoir site was received and it contained no <br />adverse comments. cooperative studies were <br />started with other Federal agencies to determine <br />the type of recreation facilities and installa- <br />tions required to accommodate future visitors <br />to the Two Forks Reservoir. We are in the <br />process of completing our plans for recreational <br />use, fish and wildlife activity on the reservoir <br />basin. This is being coordinated with the <br />Denver Water Board to insure that water contact <br />sports and other uses of the reservoir will be <br />compatible with the basic function of the <br />reservoir for a municipal water supply. <br /> <br />The final reservoir operation study on <br />Two Forks was completed and other phases of <br />the hydrology studies were continued. <br /> <br />I <br /> <br />Our st. Vrain Unit of the Missouri River <br />Basin project is being pursued, with cost <br />estimates of the dams and reservoirs and the <br />associated hydrology studies being essentially <br />completed. Estimates of annual operation, <br />maintenance, and replacement expenses are being <br />prepared. <br />