My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />determine whether or not condemnation in the <br />U. S. Federal Court will be necessary to ob- <br />tain right of possession in order to allow <br />activity on the initial contract for the <br />outlet works. <br /> <br />On page two, Engineering and Design, as <br />~tt. Saunders indicated, plans and specifica- <br />tions for the initial project construction <br />were approved a couple of years ago and with <br />minor updating they are available for adver- <br />tising and acquisition of the necessary real <br />estate. <br /> <br />From our standpoint we have significant <br />news which we have to report to the Board <br />today, and of which I have informed Dr. <br />Donnelly by airmail letter which I hope he <br />will have this morning, that is, that during <br />fiscal '68 we will be carrying out land acqui- <br />sition, continuing the engineering and design <br />for the features of the project, and initiat- <br />ing construction. Provided that real estate <br />is available, we hope to advertise the outlet <br />works in the autumn of 1967 realizing that <br />significant construction, because of winter <br />weather, will not commence before the spring <br />of 1968. The amount which could actually be <br />specified in this contract as available for <br />contractor earnings during fiscal '68 will <br />depend upon the amount appropriated by Con- <br />gress in the act now being considered. t1hat <br />we mean here is that we would advertise the <br />entire outlet works but would indicate in the <br />contract documents the specified amount which <br />would be available for earnings during fiscal <br />'68 with the indication that the contractor <br />then would look fon~ard to future fiscal years <br />for the remaining earnings. So, providing <br />that we can handle the real estate acquisitions, <br />we would hope to advertise and award next <br />October or November and actually start moving <br />earth and constructing in the spring of 1968. <br /> <br />This, sir, completes my report in regard <br />to the Trinidad project. Before prqceeding <br />to the normal written report, I wonder if <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.