My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JJV--;E" <br /> <br />the platte River subbasin have been supplied <br />to the Task Force on Irrigation System problems <br />and needs. <br /> <br />Similar data for the Republican (Kansas) I <br />River subbasin will be developed this summer <br />and should largely complete our obligations <br />in the ~~ssouri Basin. <br /> <br />Work activities related to the develop- <br />ment of required data for the ~tissouri River <br />Basin survey and the organization of the <br />survey on the upper Colorado have delayed <br />somewhat the progress of the Yampa River Basin <br />survey. It is apparent that the report on <br />this basin will not be completed by July I <br />as had previously been scheduled. However, <br />the first draft of the report will be pre- <br />pared in June and we will then begin the regu- <br />lar review and revision process with publica- <br />tion of the completed report probably in <br />september. <br /> <br />Work is continuing on the Dolores River <br />Basin survey. Subbasin areas have been care- <br />fully checked and final figures are available. <br />Soils and cover mapping is in progress. We <br />are working on the development of data regard- <br />ing land use, problem areas, and land suit- <br />ability for development. An inventory of <br />recreation activities, facilities, needs and <br />development potentials is scheduled for late <br />this summer or fall. We are not yet able to <br />make a firm estimate of the date of completion <br />of this survey, but are tentatively scheduling <br />preliminary drafts for the fall of 1968. <br /> <br />Field work schedules are now being <br />developed for the San Juan River Basin. Work I <br />will be carried on concurrently with the <br />needs of the Upper Basin Survey and we anti- <br />cipate the collection and analysis of data <br />may be substantially completed in about 18 <br />months from now. If this schedule can be <br />met, we would anticipate preparation of pre- <br />liminary drafts of the report during the <br />winter of 1968-69. <br />
The URL can be used to link to this page
Your browser does not support the video tag.