My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:>:>:>u <br /> <br />levels and wells during the latter part of <br />March, trying to get them before substantial <br />pumping started. At the same time we con- <br />ducted some seepage runs on those streams to <br />pick up the low flow and try to show \'lhere <br />there were inflows and where there were losses. <br /> <br />On the San Luis Valley project we con- <br />tinued some of the inventory work down there. <br />In addition, we installed some wells at a test <br />site in order to get some better figures on <br />evapotranspiration from the area. Ten observa- <br />tion wells were installed to monitor the ground- <br />water divide between the Cloud Basin and the <br />Rio Grande. <br /> <br />A group of 25 persons from the Arkansas <br />Valley attended a briefing on the analog model <br />capabilities and limitations on March 30 and <br />31. The group consisted of southeastern Colo- <br />rado Water Conservancy District Board members, <br />newspapermen, ditch company officials, well <br />owners, and state and federal officials. This <br />meeting was held in phoenix and I thiru< every- <br />body had a good time. I hope that the meeting <br />was particularly informative to the people in <br />the Arkansas Valley and gave them a little <br />bit better understanding of what our work down <br />there entails. <br /> <br />The Piceance Basin work has resumed. <br />They are deepening Core Hole No. 2 there. The <br />last time we were involved in this particular <br />hole we had a gas explosion at the bottom and <br />we quit drilling altogether. Now they have <br />resumed their drilling at that particular site <br />and are going from 2,100 feet down to about <br />3,200 feet. They will get started this week. <br />They had hoped to get that started the week <br />before but they had some difficulties. <br /> <br />All available chemical quality data on <br />ground water in the Baca-Prowers Counties <br />project area have been entered on punched <br />cards. The data will be statistically analyzed <br />by the digital computer and will provide a <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.