<br />~ <br /> <br />I <br /> <br />............J <br /> <br />Contract <br /> <br />Approx. Percent Complete <br /> <br />Azotea Tunnel and appurtenant <br />structures <br />Blanco Tunnel, Diversion Dam and <br />apPurtenant structures <br />Oso Tunnel <br /> <br />55% <br /> <br />68% <br />11% <br /> <br />Excavation was completed on Blanco Tunnel on March 31. 1967. <br /> <br />~avajo Indian Irrigation Project. New Mexico <br /> <br />Contract <br /> <br />Approx. Percent Complete <br /> <br />Main Canal Headworks & Tunnel NO. 1 <br />Part of ~rnin Canal and Tunnel No. 2 <br />Gobernador. 8.9. and Largo Siphons and <br />2.7 miles of 11ain Canal <br /> <br />96% <br />61% <br /> <br />3%" <br /> <br />HR. STAPLETON: <br /> <br />"We' 11 nO\-l have the report of the U. S .G. S. <br />by Ted Moulder. Ted. " <br /> <br />MR. HOULDER: <br /> <br />"Nr. Chairman. members of the Board, <br />ladies and gentlemen. the Geological Survey <br />has resumed field operations. going full steam <br />nO\-l. <br /> <br />Mountain snowpaclc for the season was near <br />normal on the upper main stem of the Colorado <br />River and on the North Platte drainage. other <br />areas varied from below normal to about 50% <br />of normal. Recent snowfall in the mountains <br />will not improve the runoff prospects appre- <br />ciably and those. areas without car~yover 'storage <br />will be faced with inadequate supplies. I <br />think this agrees with the Region 4 Bureau <br />representative's forecast. <br /> <br />Within the last two months we have been <br />working on the streamflow records for our <br />1966 report and we expect to have them ready <br />to send to the printer about the middle of <br />June. <br /> <br />In the South platte and Arkansas River <br />Valleys we made mass measurements of water <br />