My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />irrigation supplies would be distributed <br />through a group of project facilities, includ- <br />ing the Harrison, Brush Creek, and colorado <br />canals, the Cheney Lateral, and a series of <br />smaller laterals branching from the main <br />canals. Municipal and industrial water would <br />be made available for sale at the outlet Irlorks <br />of Buzzard Creek Reservoir. The project would <br />provide a supplemental water supply to 3,130 <br />acres of land and a full supply to 6,340 acres <br />and provide 3,000 acre-feet annually for M&I <br />uses. The project would also provide benefits <br />to recreation and fish and wildlife. <br /> <br />plan formulation studies, water supply <br />studies, and agricultural economic studies are <br />continuing on the Bluestone project. Founda- <br />tion drilling recently completed for the off- <br />stream Parachute Dam showed the left abutment <br />to be unstable. Costs for blanketing the <br />abutment were excessive so this feature has <br />been eliminated from the plan of development. <br />project goals will need to be modified, as <br />an economic alternative to Parachute Dam and <br />Reservoir has not been found. A proposed <br />feasibility report is scheduled for completion <br />at the end of FY 1968. <br /> <br />Work is progressing about on schedule on <br />the Grand Mesa project. A feasibility report <br />is scheduled for completion on this project <br />in FY 1969. <br /> <br />I <br /> <br />Work is also progressing about on schedule <br />on the Upper Gunnison project. Office tabula- <br />tions in connection with the project land <br />classification are nearing completion. A pro- <br />posed feasibility report is scheduled for <br />completion in FY 1970. <br /> <br />On the Yellow Jacket project, a project <br />in the vicinity of r-Iee]~er, feasibility design <br />data for Thornburgh Dam, Lost Park Dam, Ripple <br />Dam, Milk Creek Diversion Dam, and major <br />structures for Yellow Jacket and Josephine <br />Basin Canals have been submitted to the Chief <br />
The URL can be used to link to this page
Your browser does not support the video tag.