My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.,J.,J.,J:;,J <br /> <br />~ <br /> <br />is finished. The work that remains to be <br />accomplished is the work of installation of <br />the turbines, generators, and appurtenant <br />electrical facilities. This work is about <br />80 percent complete and we estimate n~l that <br />the first generator will go on the line for <br />commercial generation in about June or July. <br /> <br />At t-torrow point, the second dam of the <br />Curecanti unit, construction activities were <br />again started, as far as concrete placement <br />in the dam proper, on March 27. We anticipate <br />that this dam will be topped out this summer - <br />probably in about August. The contractor has <br />completed placing the concrete in the under- <br />ground powerplant; he has completed the con- <br />crete work on both penstocks and in both draft <br />tube tunnels; and is placing concrete in the <br />stilling. basin and the weir below the dam. <br />Overall completion of this dam is now about <br />80 percent. <br /> <br />On t4ay 23 the Bureau of Reclamation will <br />open bids for the removal of water from the <br />outlet works stilling basin at Navajo Dam. <br />This is going to be necessary for contractors <br />to view work necessary to submit bids for <br />modification of the outlet works. This modi- <br />fication work should t~,e place probably <br />about August of this year. <br /> <br />- <br /> <br />On our participating projects, the silt <br />project is substantially finished. The work <br />remaining consists of surfacing the relocated <br />state highway. The project is operating this <br />year and delivering some water. In spite of <br />the late closure of the dam last fall and a <br />rather poor water year, we have the reservoir <br />about one-third full. <br /> <br />Two or three other small items in here. <br />On the Smith Fork project, we had a small modi- <br />fication to m~,e on the diversion dam. That <br />work has been completed and the dam is in <br />operation. Also the repair work on the Gunni- <br />son Tunnel was finished on March 22nd and that <br />tunnel placed back in operation. On our other <br />
The URL can be used to link to this page
Your browser does not support the video tag.