My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01677
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:20 PM
Creation date
10/4/2006 7:00:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.1 <br />, <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />\ <br /> <br />GREELEY & LOVEL;\ND IRRIGA nON CO, - EQUALIZER DAM REHABILIT A nON <br /> <br /> <br />Proiect Description <br /> <br />This $385,000 project was the rehabilitation of the Greeley & Loveland Irrigation <br />Company's Equalizer Reservoir located east of Loveland. The project included replacement of the <br />dam outlet gate with a new structure, which incorporated both the outlet gate and a spillway. The <br />existing dam embankment was also raised almost four feet. ECI Consultants, Inc. of Englewood <br />prepared the construction plans and specifications with the construction contract awarded to <br />Schmuesor and Associates, Inc. of Wheatridge, CO. Construction commenced on November 16, <br />1998, was completed in early March 1999, with Substantial Completion on May 7,1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Greeley & Loveland Irrigation Co. County: Larimer <br /> <br />River: Big Thompson River <br /> <br />Terms of Loan: $308,000 @ 4.21 % for 30 yrs. <br /> <br />Substantial Completion Date: May 7, 1999 <br /> <br />Design Engineer: ECI Consultants, Inc. - Englewood, Colorado <br /> <br />Construction Contractor: Schmuesor and Associates, Inc. - \Nheatridge, Colorado <br /> <br />Design Criteria: <br /> <br />Length of Dam Crest = 2,600 ft. <br />Volume of Reservoir = 1,700 ac.ft. <br />Outlet Gate = 5 - 4 ft. x 4 ft. slide gates <br />100 - Year Emergency Spillway = 20 ft. long x 9 ft. high <br /> <br />Annual Volume of Water Delivered by the Project: 885 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.