My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01677
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:20 PM
Creation date
10/4/2006 7:00:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~':' ' <br /> <br />~ <br /> <br />BUFFALO MUTUAL IRRIGATION CO-DIVERSION STRUCTURE REHABILITATION <br /> <br />" <br />, <br /> <br />e <br /> <br /> <br />The Ditch Company Officer~ Operating Their New Headgates <br /> <br />Proiect Description <br /> <br />This $600,000 project was the re-constJUction of the Buffalo Mutual Irrigation Company's <br />diversion structure and headgate on the Arkans~ River in Prowers County 17 miles east of the City <br />of Lamar. The existing steel and wood dam and headgate had been in place for more than 50 years <br />and was structurally deficient. Wright Water Engineers of Denver, Colorado completed project <br />design and preparation of construction contract documents. The construction contract was awarded <br />to TLM Constructors, Inc. of Swink, Colorado and construction commenced September 21, 1998. <br />The project was completed in June 1999. <br /> <br />e <br /> <br />Proiect Data <br /> <br />Sponsor: Buffalo Mutual Irrigation Company <br /> <br />County: Prowers <br /> <br />River: Arkansas River <br /> <br />Terms of Loan: $453,250 @ 3.75% for 30 yrs. <br /> <br />Substantial Completion Date: June 14,1999 <br /> <br />Design Engineer: Wright Water Engineers - Denver, Colorado <br /> <br />Construction Contractor: TLM Constructors, Inc. - Swink, Colorado <br /> <br />Design Criteria: <br /> <br />Length of Overflow Diversion Structure = 200 feet <br />Diversion Headgate = 3 - 5 ft. x 6 ft. slide gates <br />Headgate Flushing Structure = I - 6 ft. x 4 ft. slide gate <br /> <br />Annual Volume of Water Delivered by the Project: 17,560 ac.ft. <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.