Laserfiche WebLink
<br />; <br /> <br />'" <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />WAMSLEY CATTLE COMPANY - POLE MOUNTAIN DAM REHABILITATION <br /> <br /> <br />.....' .~~. <br /> <br />. Proiect Description <br /> <br />This small dam rehabilitation project commenced in March 1994 by the owners of the <br />Wamsley Cattle Company. The project consisted of replacing the reservoir's outlet structure and <br />flattening the dam's upstream slope. Smith Geotechnical Engineering (SGE) of Ft. Collins <br />completed the project design. The project was constructed under the supervision of SGE and the <br />State Engineer's Office by the owner's own forces. The owner completed the work after several <br />years of effort between ranching, fanning and construction. The State Engineer's Office recently <br />approved the reservoir's filling plan and substantial completion was June 30, 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Wamsley Cattle Company <br /> <br />Coonty: Jackson <br /> <br />River.. Off-Stream Drainage <br /> <br />Terms of Loan: $34,036.41 @ 3% for 40 yrs. <br /> <br />Substantial Completion Date: June 30,1999 <br /> <br />Design Engineer: Smith Geotechnical Engineerirtg - Ft. Collins, Colorado <br /> <br />Construction Contractor: Wamsley Cattle Company Owners - Coalmont, Colorado <br /> <br />Design Criteria: <br /> <br />Dam Height = lIS feet <br />Length of Crest = 782 feet <br />Outlet = 280 ft. long - 24 inch diameter steel pipe <br />Ave. VIS slope = 4: 1 Ave. DIS slope = 2.2: 1 <br /> <br />Annual Volume of Water Delivered by the Project: 1,905 ac.ft. <br />