My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01677
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:20 PM
Creation date
10/4/2006 7:00:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />/ <br /> <br />TOWN OF JOHNSTOWN - LONE TREE PIPELINE RECONSTRUCTION PROJECT <br /> <br /> <br />tit <br /> <br />Placement of the 16 inch Diameter - Ductile Iron Pipeline <br /> <br />Proiect Description <br /> <br />This $2,700,000 project includes the replacement of 11 miles of open ditch with a 14-16 <br />inch pipeline from Lonetree Reservoir to the Town of Johnstown's water treatment plant including _ <br />a booster station at the reservoir and connection facilities at the treatment plant. PRC ,., <br />Environmental Management, Inc. of Denver designed the project. The construction contract was <br />awarded to Hall-lIwin Construction Co. (pipeline) of Greeley and B.T. Construction, Inc. (pump <br />station/electrical) of Broomfield August 6, 1996. Construction commenced in early October 1996 <br />and was completed in May 1998. Project documentation and final accounting delayed substantial <br />completion until June 30, 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Town of Johnstown <br /> <br />County: LarimerlWeld <br /> <br />River: Big Thompson River <br /> <br />Terms of Loan: $1,948,932.60@4% for 30 yrs. <br /> <br />Substantial Completion Date: June 30,1999 <br /> <br />Design Engineer: PRC Environmental Management, Inc. - Denver, Colorado <br /> <br />Construction Contractor: Hall-Irwin Construction, Inc. - Greeley, Colorado <br />B.T. Construction, Inc. - Broomfield, Colorado <br /> <br />Design Criteria: <br /> <br />Length of Pipeline = approx. 11 miles <br />Pipeline diameter = 14 - 16 inch <br />Pipeline Material = Ductile Iron Pipe <br /> <br />Annual Volume of Water Delivered by the Project: 2,200 ac.ft. <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.