Laserfiche WebLink
<br />, <br /> <br />'. <br /> <br />e <br /> <br />. <br /> <br />e <br /> <br />Consolidated Mutual Water Companv - Fortune Reservoir Dam Construction <br /> <br />Authorization: SB 99-173 <br />Water Source: Clear Creek <br />Terms of Loan: $10,000,000 @4.75% for 10 years <br /> <br />County: Jefferson - NW of Arvada <br />Project Yield: 8,869 ac.ft. <br />Project Type: New Dam Construction <br /> <br />This project is the construction of a new 9,000 acre-foot reservoir northwest of Arvada. <br />The project consists of a lOS-foot high, zoned earth embankment, Probable Maximum Flood <br />emergency spillway, with a 30-inch diameter outlet pipe. The Company has contracted with Tuttle- <br />Applegate, Inc, of Denver to prepare the final design drawings and construction contract <br />documents. The plans are currently being reviewed by the State Engineer's Office and construction <br />is scheduled to commence in the fall of 1999. <br />