My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01677
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:20 PM
Creation date
10/4/2006 7:00:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />'. <br /> <br />e <br /> <br />. <br /> <br />e <br /> <br />Consolidated Mutual Water Companv - Fortune Reservoir Dam Construction <br /> <br />Authorization: SB 99-173 <br />Water Source: Clear Creek <br />Terms of Loan: $10,000,000 @4.75% for 10 years <br /> <br />County: Jefferson - NW of Arvada <br />Project Yield: 8,869 ac.ft. <br />Project Type: New Dam Construction <br /> <br />This project is the construction of a new 9,000 acre-foot reservoir northwest of Arvada. <br />The project consists of a lOS-foot high, zoned earth embankment, Probable Maximum Flood <br />emergency spillway, with a 30-inch diameter outlet pipe. The Company has contracted with Tuttle- <br />Applegate, Inc, of Denver to prepare the final design drawings and construction contract <br />documents. The plans are currently being reviewed by the State Engineer's Office and construction <br />is scheduled to commence in the fall of 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.