My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01669
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:11 PM
Creation date
10/4/2006 7:00:17 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/14/1970
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />this morning. I am very happy to be here and <br />give you the status of Region 7's operations <br />in Colorado. As he said, we have these new <br />investigations that we are starting right now <br />for this fiscal year. As you know, we didn't <br />get the money until about two weeks ago for I <br />the new investigations so we are just getting <br />under way. We will talk a little bit about <br />our Narrows Project and also the Upper South <br />Platte or the TWo Forks area. <br /> <br />First, I'll talk about the new investi- <br />gations in regard to the Arkansas Valley <br />Project. Here is a map that shows you from <br />the Continental Divide to the state line east <br />and from the Arkansas River to the state line <br />north. Investigations on the Arkansas Valley <br />Project will be initiated this year and are <br />scheduled to be completed in FY 1972. This <br />is a reconnaissance investigation which will <br />cover the Arkansas Valley from Pueblo Dam to <br />the Kansas state line. We will explore the <br />potentialities for enhancing irrigation water <br />supplies by improvements to existing irriga- <br />tion systems by integrated use of ground and <br />surface water supplies, and by increased regu- <br />lation of flood and normal flows in the Colo- <br />rado portion of the Upper Arkansas River <br />Basin. <br /> <br />The Armel Unit, Which is near Bonny Dam <br />(Mr. Nelson is pointing at it now), we made <br />a report on that under the st. Francis Unit. <br />This Armel Unit was authorized in the Flood <br />Control Act of 1944 and Bonny Dam and Reser- <br />voir, located on the Republican River near <br />the state line, were constructed as an <br />emergency flood control measure in advance <br />of the finalization of irrigation plans. I <br />Construction of the dam was completed in <br />1951. A definite plan report relating to <br />the irrigation features of the unit was com- <br />pleted in April 1954. However, construction <br />of the irrigation facilities was deferred <br />because of a lack of interest in irrigation <br />aut there at that time. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.