Laserfiche WebLink
<br />certain authorizations, to complete the <br />project?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"I think there was about a one year <br />delay in this latest cutback, wasn't <br />there Charley?" <br /> <br />MR. HIPP: <br /> <br />"YeEl, but there have been other delays. <br />I think there were three before." <br /> <br />MR. STAPLETON: <br /> <br />"What is the project completion date <br />as of now?" <br /> <br />COL. LEIGHTY: <br /> <br />"The final closure, I believe, is <br />1974. The completion I think is 1973." <br /> <br />MR. BUNGER: <br /> <br />"I didn't hear any mention of flood <br />control on Clear Creek. Has the Army <br />made any investigations on that?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"That is going to be included in our <br />general South Platte investigations. We <br />have a request for an interim report on <br />that at the present time. We plan to <br />include that in the overall report which <br />is, at the present time, scheduled for <br />completion in about 1972. We have not <br />gotten to that point in our studies at <br />this time." <br /> <br />MR. BUNGER: <br /> <br />"I see, thank you." <br /> <br />MR. STAPLETON: <br /> <br />"I hotice you have Two Forks Dam on <br />your map there. What's the Corps of <br />Engineers reference to that?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"This is a Board map." <br /> <br />MR. STAPLETON: <br /> <br />"Are there any further questions? <br />I've got one last question. What's the <br />flood plain information on Sand Creek on <br />the north-south runway at the airport? <br />Is there any problem?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"We have included in our report on Sand <br /> <br />I <br /> <br />I <br /> <br />~- <br />