My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01663
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:04 PM
Creation date
10/4/2006 7:00:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
8/6/1969
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />the Sand Creek basin, we did not include <br />recreation pools in those reservoirs. So <br />the type of recreation we were thinking of <br />there would be a city park land type devel- <br />opment and would include swimming pools <br />and this type of thing that are normally <br />found in city parks. <br /> <br />So all three reservoir projects that <br />are proposed in the Denver metropolitan <br />area would include recreation. The total <br />cost, the seperable cost to recreation, at <br />Castlewood is about $2 million and the <br />total cost at Sand and Toll Gate is about <br />$2,800,000. So the local share would be <br />half of that." <br /> <br />MR. STAPLETON: <br /> <br />"What's the situation on the Cherry <br />Creek site from the dam down to the con- <br />fluence with the Platte, channel straight- <br />ening and what not? Where it would stop. <br />Would it stop at the Cherry Creek Shop- <br />ping Center or how far down in the popu- <br />lated area do you intend to carry this?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"The plan as we have it envisioned <br />right now would include the straightening <br />and armoring of the channel from the <br />Cherry Creek Dam to the existing concrete <br />walled area. This would include riprap <br />lining. From there on down to the South <br />Platte River would include armoring the <br />bed only and repairing some of the walls." <br /> <br />MR. STAPLETON: <br /> <br />"The concrete starts maybe at Downing, <br />doesn't it?" <br /> <br />MR. VELEHRADSKY: <br /> <br />"r think it's in the Speer Boulevard, <br />where Speer Boulevard crosses in that <br />area. II <br /> <br />I <br /> <br />MR. STAPLETON: <br /> <br />"How many years delay have you had <br />in the final completion of Chatfield as <br />a result of these cutbacks? When do you <br />say you will now be able, if you get <br />
The URL can be used to link to this page
Your browser does not support the video tag.