My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01663
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:04 PM
Creation date
10/4/2006 7:00:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
8/6/1969
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />vv~~ <br /> <br />Foundation exploration at the 3 dam <br />sites was completed in June of 1968. <br />Based on the results of the foundation <br />explorations, detailed design of the 3 <br />Bijou Creek dam sites has been initiated. <br />Studies are being made to determine ground <br />water recharge potential of the 3 dams. <br />The 3 dams in the Bijou Creek basin would I <br />control about 70 percent of the basin's <br />1,500 square mile drainage area. prelimi- . <br />nary studies indicated that about 75 per- . <br />cent of the flood control benefits attri- <br />butable to the Bijou Creek dams would <br />result from the reduction of flood damage <br />potentials along the South Platte River. <br />The remaining 25 percent of the flood <br />control benefits would result from flood <br />damage reduction in the Bijou Creek basin. <br />Total cost of the 3-dam system is estimated <br />to be about $40 million. <br /> <br />Local interests at Deer Trail, in <br />July 1968, requested an investigation of <br />the town's flood problem under provisions <br />of Section 205 of the 1948 Flood Control <br />Act, as amended. The reconnaissance in- <br />vestigation is essentially complete, and <br />it appears that a levee would be economi- <br />cally feasibile. Local interests have <br />been asked if they can provide the necessary <br />local cooperation, but they have indicated <br />a preference for an upstream reservoir. <br /> <br />The Corps' studies in the Bijou Creek <br />basin have been separated from the South <br />Platte River investigation. An interim <br />report covering the Bijou Creek basin is <br />scheduled for completion in late 1969. <br />Studies are currently under way to deter- <br />mine if alternatives of the 3-dam system <br />are practicable. One alternative being I <br />investigated includes a dam on East Bijou <br />Creek near Agate and a dam on Middle Bijou <br />Creek downstream from Highway 36. If the <br />alternative dam, are more practicable. a : <br />
The URL can be used to link to this page
Your browser does not support the video tag.