My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01653
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:55 PM
Creation date
10/4/2006 6:59:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />1 Decker Lateral Comoanv - Rehabilitation of the Decker Lateral Ditch <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Owl Creek Supply and Irrigation <br />Terms of Loan: $100,000 @4.25%for30yrs <br /> <br />County: Weld <br />Project Yield: 4,000 ac.ft. <br />Project Type: Concrete Ditch Lining <br /> <br />TIlls $145,000 project is the concrete lining of approximately 7,900 feet of an existing open <br />channel irrigation ditch in Weld County northeast of Greeley. The Greeley Office of the Natural <br />Resource Conservation Service prepared project design. The construction contract was awarded to <br />Pete D&L Contractors, Inc. of Evans, Colorado November 5, 1997. Project construction is <br />scheduled to commence November 18, 1997 with project completion scheduled for April 1998. <br />TIlls ditch-lining project is currently 50% complete. <br /> <br />Pinon Mesa Ranches Community Association - Rural Raw Water Svstem Construction <br /> <br />Authorization: SB 97-008 <br />Water Source: Florida River <br />Terms of Loan: $206,000 @ 3.75% for 30 yrs <br /> <br />County: La Plata <br />Project Yield: 125 ac.ft. <br />Project Type: Diversion and Dist. System <br /> <br />TIlls $275,000 project is the construction of a new rural raw water irrigation and distribution <br />system in La Plata County west of Ignacio. The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion <br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br />from the storage impoundment to the water users. RMI Enviromnental Services of Fannington, <br />New Mexico prepared project design. Project construction commenced September 2, 1997 by RMI <br />Enviromnental Services of Fannington, New Mexico (a designlbuild contractor). Project <br />completion is scheduled for May 1998 with construction currently 50% complete. <br /> <br />Farmers Indeoendent Ditch Comoanv - Rehabilitation of the Farmers Indeoendent Ditch <br /> <br />Authorization: Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $55,000 @ 3.75% for 30 yrs <br /> <br />County: Weld <br />Project Yield: 15,000 ac.ft. <br />Project Type: Pipeline <br /> <br />TIlls $75,000 project is the re-construction of approximately 1,000 linear feet of 24-inch <br />diameter concrete pipeline replacing an existing open ditch in poor condition. The project is <br />located in Weld County southwest of Platteville. The Greeley Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced by Robb's Repair, <br />Inc. of Evans, Colorado November 10, 1997 with project completion re-scheduled for May 1998. <br />The project is currently 50% complete with the final pipe segments to be placed when weather <br />permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.