My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01653
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:55 PM
Creation date
10/4/2006 6:59:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"..> ~I:"~ c."""' <br />~:::"~. <br /> <br />,. <br /> <br />Johnstown. Town of - Raw Water Pioeline <br /> <br />Authorization: SB 94-29 <br />Water Source: Big Thompson River <br />Terms of Loan: $2,500,000 @4% for 30 years <br /> <br />I <br /> <br />\> <br /> <br />County: Larimer <br />Project Yield: 2,200 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />e <br /> <br />. The project includes the replacement of II miles of open ditch with a 14-16 inch pipeline <br />from Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster <br />station at the reservoir and connection facilities at the treatment plant. PRC Environmental <br />Management, Inc. of Denver designed the project. The construction contract was awarded to Hall- <br />Irwin Construction Co. of Greeley and B.T. Construction, Inc. of Broomfield August 6, 1996. <br />Construction commenced in early October 1996 and was completed in June 1997. Project <br />documentation and final accounting is currently undeIWay with substantial completion scheduled in <br />April 1998. The Town is considering additional work at their storage reservoir to utilize their entire <br />loan authorization. <br /> <br />Hawkeve Lateral Ditch Companv - Rehabilitation of the Hawkeve Lateral Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Colorado River /Grand Valley Canal <br />Terms of Loan: $143,000 @3.75%for30yrs <br /> <br />County: Mesa <br />Project Yield: 1,260 ac.ft. <br />Project Type: Pipeline <br /> <br />e <br /> <br />This $490,000 project is the construction of approximately 11,750 linear feet of pipeline <br />replacing an existing open concrete ditch in poor condition. The project is located in Mesa County <br />northeast of Fruita. The Grand Junction Office of the Natural Resource Conservation Service <br />prepared project design. The construction contract was awarded to L & M Construction, Inc. of <br />Grand Junction November 7, 1997 and is scheduled for completion in April 1998. The project is <br />currently 95% complete with the pipeline leak test scheduled for April when water becomes <br />available. <br /> <br />Chipoerfield Lane Ditch Companv - Chipperfield Lane Headgate and Pipeline Rehabilitation <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Dry Hollow Creek <br />Terms of Loan: $60,000 @ 3.75% for 30 yrs <br /> <br />County: Garfield <br />Project Yield: 220 ac.ft. <br />Project Type: Headgate and Pipeline <br /> <br />This $80,000 project is the construction of 10,000 feet of pipeline replacing an existing <br />open ditch in poor condition. The project also consists of reconstruction of the existing inlet <br />structure at the Multa Trina Ditch. The Glenwood Springs office of the Natural Resources <br />Conservation Service prepared project design. Project construction commenced November I, 1997 <br />by the Ditch Company's own forces. Project completion is scheduled for April 1998. The pipeline <br />project is currently 90% complete with the final 200 foot pipe segment to be placed when weather <br />permits. <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.