My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01653
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:55 PM
Creation date
10/4/2006 6:59:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~'.<!l'_"~f!' <br /> <br />-:r" <br /> <br />, <br />, <br />:,. <br /> <br />:J-' <br />'r,. " <br /> <br />Town of Morrison - Raw Water Pioeline Rehabilitation <br /> <br />\ <br /> <br />Authorization: SB 95-1115 <br />Water Source: Bear Creek <br />Terms of Loan: $504,000 @ 5% for 30 yrs <br /> <br />County: Jefferson <br />Project Yield: 625 ac.ft. <br />Project Type: Pipeline/Grit Chamber <br /> <br />e <br /> <br />This $672,000 project is the construction of a new raw water grit chamber and transmission <br />line replacing a similar functionally obsolete facility in Jefferson County for the Town of Morrison. <br />The project consists of construction of a new concrete grit chamber at the Bear Creek diversion <br />structure and the construction of approximately 900 feet of Ductile Iron and HDPE transmission <br />pipeline along a precarious canyon wall. McLaughlin Water Engineers, Inc. of Denver, CO <br />prepared project design. The project construction contract was awarded to J.R. Walton <br />Construction Co. of Indian Hills, Colorado September 18,1997. Construction commenced October <br />I, 1997, is currently 75% complete and scheduled for substantial completion in June 1998. <br /> <br />Wamslev Cattle Comoanv - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $45,000 @ 3% for 40 years <br /> <br />County: Jackson <br />Project Yield: 1,905 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />e <br /> <br />This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br />dam's upstream slope. The remaining work includes placement of the upstream face riprap and <br />installation of the outlet gate. The project has been re- scheduled for completion in 1998. <br /> <br />Durkee Ditch Comoanv - Rehabilitation of the Durkee Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Currant Creek <br />Terms of Loan: $120,000 @3.75%for30yrs <br /> <br />County: Delta <br />Project Yield: 2,000 ac.ft. <br />Project Type: Headgate and Pipeline <br /> <br />This $343,000 project is the construction of a new concrete headgate and turnouts, and <br />construction of approximately 13,000 feet ofPVC pipeline replacing an open channel ditch in Delta <br />County northeast of Delta, Colorado. The Delta and Grand Junction Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced September 8, 1997 a <br />by K C Equipment and Consulting of Delta, Colorado. Phase I of the project was completed in ... <br />December 1997 with the final Phase II scheduled for completion in October 1998. The project is <br />currently 50% complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.