My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01601
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:22 PM
Creation date
10/4/2006 6:59:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/6/1962
Description
Meeting and resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the report will be completed early in FY 1963. <br />The Juniper Report will appraise the possibili- <br />ties for power generation on the'Yampa River, <br />utilizing storage at the potential Juniper, <br />Cross Mountain, and Lily Park Reservoir sites. <br /> <br />I <br /> <br />The Ruedi-Western Slope reconnaissance <br />investigations are essentially completed. These <br />investigations involve the possible uses of <br />water on the potential Bluestone and Basalt <br />Projects that would be provided by the Ruedi <br />Reservoir (Fryingpan-Arkansas Project). The <br />two project analySes will be combined in one <br />report on the Ruedi-Western Slope investigations <br />to be completed early in FY 1963. <br /> <br />The Upper Gunnison Basin reconnaissance <br />investigations, consisting of a review of pro- <br />posed project lands, water supply studies, plan <br />formulation studies and estimates, are in <br />progress. Completion of the reconnaissance <br />report is scheduled for FY 1963. <br /> <br />Under feasibility investigations, the <br />feasibility report on the Animas-La Plata, after <br />having been reviewed by various interests at <br />the field level, was revised and in March 1962 <br />was submitted to the Commissioner of Reclama- <br />tion. The Commissioner has approved the report <br />and it should soon be distributed to interested <br />State and Federal agencies for formal review <br />under provisions of the Flood Control Act of <br />1944. <br /> <br />I <br /> <br />Feasibility investigations on the Dolores <br />Project are essentially complete, and the pro- <br />posed feasibility report has been completed and <br />distributed for review by the Commissioner, <br />Assistant Commissioner and Chief Engineer, and <br />various State and Federal agencies at the field <br />level. <br /> <br />The feasibility report on the Bostwick Park <br />Project has been approved by the Secretary of <br />the Interior and reviewed under the Flood Con- <br />trol Act of 1944. The Secretary of the Interior <br />transmitted the report to the President on <br />February 26, 1962. <br />
The URL can be used to link to this page
Your browser does not support the video tag.