My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01601
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:22 PM
Creation date
10/4/2006 6:59:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/6/1962
Description
Meeting and resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />getting underway now and will sponsor the <br />groundbreaking blast tomorrow at the cere- <br />monies. The highway work is moving along in <br />good shape. There is a little delay on steel <br />deliveries this summer that we are disappointed <br />in but I guess there is nothing we can do about <br />it. At this time I'd like to compliment the <br />Colorado Highway Department on the job they <br />have done for us on the highway relocations <br />around Blue Mesa Reservoir. It's been a <br />pleasure to work with that organization in both <br />the planning phase of it and I think it was <br />most unusual that they were willing to risk <br />some of their own funds before we had the first <br />appropriation for Blue Mesa to get going on the <br />survey work. If they had not done that we <br />would not have been able to award the prime <br />contract this spring the way we did. They <br />saved one working season by moving ahead with <br />their survey work. <br /> <br />The preconstruction work is underway now <br />on Morrow Point Dam and powerplant and we hope <br />to get the specs out on that next year and <br />get that one underway. We have recently com- <br />pleted the feasibility report on the Crystal <br />Unit - Crystal Dam - that one is in the Com- <br />missioner's office now. <br /> <br />I <br /> <br />Construction on the Collbran Project pro- <br />gresses. On May 25, 1962, embankment repairs <br />on the Souths ide Canal and earth lining opera- <br />tions in the Leon-Park Feeder Canal were com- <br />pleted. The Upper and Lower Molina Powerplants <br />are near completion, but particular diffi- <br />culties encountered in the delivery of materials <br />have delayed final completion. Vega Dam and <br />Reservoir, which was completed late in 1959, <br />filled and spilled for the first time in June <br />of this year. <br /> <br />With improved weather, construction on <br />the Florida project has been accelerated. <br />Placement of earth fill in the embankment of <br />Lemon Dam was resumed on May 15, and concrete <br />placement in the outlet works tunnel and. <br />
The URL can be used to link to this page
Your browser does not support the video tag.