My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01601
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:22 PM
Creation date
10/4/2006 6:59:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/6/1962
Description
Meeting and resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />About thirty years ago this summer the <br />blocks at Hoover Dam were standing about the <br />same place. So it has taken a long time to <br />get the Colorado River developed - certainly to <br />get into the Upper Basin. <br /> <br />I <br /> <br />Since our last report I think there has <br />been one significant event on Glen Canyon. <br />That's the award of the completion contract. <br />It was approximately an $8 million contract <br />awarded to Ets-Hokin & Galvan, Inc., San Fran- <br />cisco on June 25. This contractor will be re- <br />quired to complete all of the concrete and <br />architectural finishes on the dam; install <br />turbines, transformers and accessory equipment; <br />in fact, do everything else except installation <br />of the generators which will be done by the <br />manufacturer. This has been common practice on <br />our jobs to not award the work that comes at <br />the tail end of the job in the original plan <br />contract because of the long time that elapses <br />between the start of a job and the time this <br />work comes on. <br /> <br />Another important event this summer on <br />Glen Canyon is that the Secretary in April <br />announced the criteria for filling of Lake <br />Powell and we hope to make that closure next <br />spring and get on with the job of filling the <br />large reservoir behind Glen Canyon. The actual <br />filling program for the storage reservoirs on <br />the Storage Project is actually underway. It <br />got underway last week with the closure of the <br />gates and the dropping of the stoplogs at <br />Navajo Dam. We hope to make the closure this <br />fall at Flaming Gorge. <br /> <br />I <br /> <br />On this matter of the closure and filling <br />of the reservoirs, I think we are very fortunate <br />this year in the kind of runoff, particularly <br />the kind of snow cover that was laid down here <br />in Colorado during the past winter and the way <br />it came off. We're getting a large volume of <br />runoff and yet no serious flooding because of <br />the way nature brought it off, staying reason- <br />ably cool during the month of May. This high <br />runoff this year is going to go a long way <br />
The URL can be used to link to this page
Your browser does not support the video tag.