My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01601
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:22 PM
Creation date
10/4/2006 6:59:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/6/1962
Description
Meeting and resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. STAPLETON: <br /> <br />MR. MILLER: <br /> <br />MR. GREER: <br /> <br />things and accumulating this data both by <br />ditches and by river reaches. <br /> <br />The second part of the study, a historic <br />water utilization study, we had to determine <br />the water supply. Again it consisted of the <br />ground water, surface diversions, precipita- <br />tion, and to determine where this water goes to. <br />Part of it is canal losses; farm losses; con- <br />sumptive use by crops. <br /> <br />I <br /> <br />Both one and two are done. The third part <br />of the study is partially done. This consists <br />of determining the water available in the future. <br />In this we needed a water rights analysis and we <br />have completed that; a determination of the <br />Colorado-Big Thompson return flows, we have <br />completed that; a determination of future <br />municipal return flows, both as to quantity and <br />location, and we are deep into this. We haven't <br />completed the estimated amount of water that <br />might be in the river at various times from this <br />source. And we must determine the future level <br />of ground water pumping; that is, how much pump- <br />ing is going to be done in the future, and we <br />are also into this part of No.3. When these <br />are done, we'll be ready to go into No.4 which <br />is the determination that the Steering Committee <br />asked for of the difference between the two sites, <br />the Weld County and the Narrows. <br /> <br />I think that is all, Mr. Chairman." <br /> <br />"Thank you, Mr. Greer. Do the Board members <br />have any questions?" <br /> <br />"Mr. Chairman, I'd like first of all to <br />indicate my support thoroughly on the Green <br />Mountain afterbay. I wonder, Gus, if you could <br />tell us precisely what purpose this would serve. <br />I think the people here should know that." <br /> <br />I <br /> <br />"The Green Mountain Reservoir, of course as <br />you mostly all know, on the Blue Reservoir is <br />a replacement reservoir for the Colorado-Big <br />Thompson Project. It has a powerplant below <br />
The URL can be used to link to this page
Your browser does not support the video tag.