My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01589
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:02 PM
Creation date
10/4/2006 6:58:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/11/1956
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />-{3-62 <br /> <br />MR. CRAWFORD: "Yes <br /> <br />I have asked Mr. Barnard to meet with me <br />and go over the bill, and we will get it in <br />shape." <br /> <br />I <br /> <br />6. Future Plans, Region 4. Bureau of Reclamation <br /> <br />!ViR. CRAWFORD: <br /> <br />"I wouid like, at this time, to read a letter <br />from'Mr. Larson, under date of December 22, <br />1955. <br /> <br />Mr. Ivan C. Crawford, Director <br />Colorado Water Conservation Board <br />212 State Office Building <br />Denver, Colorado <br /> <br />Dear Mr. Crawforq: <br /> <br />As promised by Mr. Jacobson at November 29 meeting <br />of Colorado Water Conservation Board, we are forwarding <br />information regarding the schedules and plans for investiga- <br />tions in the Gu~ison River and Cliffs-Divide areas. <br /> <br />The progress we have made since our June 10, 1955 <br />letter to you outlining our FY 1956 program in the <br />Grand Junction and Durango Offices, and our future plans <br />are as follows: <br /> <br />Fruitland Mesa Project. Field work on the <br />detailed land classification is approximately 65% .complete. <br />Field work was suspended in mid November due to snow <br />conditions and will not be resumed until April or May. <br />Three drill holes were completed on the Big Soap Park Dam <br />site which showed even better foundation rock than <br />anticipated considering that the foundation rock is <br />volcanic agglomerate. Field exploration for construction <br />materials for Big Soap Park was completed and some progress <br />on topographic surveys for the reservoir site was made <br />before the snow came. Completion of the preliminary draft <br />of the report is scheduleifor June 1957. <br /> <br />Parshall Project. All investigational work was <br />suspended after the ~eptember 22 meeting with: representatives <br />of the Colorado Water Conservation Board, and the city of <br />Denver. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.