My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01582
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:26 PM
Creation date
10/4/2006 6:58:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1957
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />711 <br /> <br />I <br /> <br />Preliminary water supply studies have been completed which <br />indicate that not all of the potential land areas can be <br />served by the project. Completion of a feasibility report <br />is scheduled for the spring of 1959. <br /> <br />Yampa-White Project <br /> <br />Since my last meeting with the Board, the Yampa-White <br />reconnaissance report was completed. Copies of the report have <br />been furnished to Mr. Crawford who has distributed the report <br />to interested parties. This project was discussed. particular- <br />ly the Yellow Jacket Unit by representatives of the Bureau at <br />the White River Soil Conservation District annual meeting at <br />Meeker on March 22. <br /> <br />San Miquel Project <br /> <br />Plans for the development of the San Miguel Project <br />were outlined in a status report prepared by the Bureau in <br />1953. Recently considerable interest in the project by local <br />water users has developed. Our present program provides for <br />initiating feasibility investigations in fiscal year 1959. <br />Investigations for the San Miguel project cannot be undertaken <br />until reports for the higher priority projects--Pine River Ex- <br />tension, Florida, Dolores,. ahd Animas-La Plata--are completed. <br /> <br />Savery-Pot Hook <br /> <br />A preliminary draft of a feasibility report was com- <br />pleted in July 1954 and circulated to the States of Wyoming and <br />Colorado. On February 7, 1957, another meeting was held in <br />Baggs, Wyoming, at which time the possibility of an independent <br />development of the Wyoming or Savery unit of the project was <br />discussed. The Colorado Water Users, by vote, favored the <br />Bureau proceeding with its report on the present plan, The <br />Wyoming users, however, voted to organize an irrigation dis- <br />trict, and then study the possibility of Wyoming building the <br />Savery, or Wyoming unit, separately. If their studies shbw <br />this cannot be done, they may then join Colorado in going for- <br />ward under the Bureau plan. <br /> <br />I <br /> <br />I understand that a local committee has been organ- <br />ized to establish the Savery-Pot Hook Water Conservancy Dis- <br />trict in Moffatt County, Colorado. <br /> <br />Bostwick Park Project <br /> <br />Land classification and drainage surveys were essen- <br />tially completed last month. Work is being continued on water <br />supply and plan formulation studies. A feasibility report is <br />scheduled for completion in early 1958. <br />
The URL can be used to link to this page
Your browser does not support the video tag.