My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01582
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:26 PM
Creation date
10/4/2006 6:58:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1957
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,uu <br /> <br />A definite plan report of the Navajo Unit is <br />scheduled for completion in December. 1957. The Chief Engi- <br />neer has been requested to prepare a design and estimate of <br />the dam. This data will be included in the definite plan <br />report. <br /> <br />I <br /> <br />Invitations are scheduled to be issued shortly for <br />construction of a small temporary construction camp to be <br />located about 5 miles below the dam. Present plans call for <br />the completion of construction specifications for the Navajo <br />Dam by February 1958 and award of the prime contract about <br />April, 1958. <br /> <br />Collbran Proj ect <br /> <br />The repayment contract for the Collbran project <br />has been approved by the Secretary of the Interior and re- <br />turned to the Collbran Conservancy District. The District <br />held a referendum yesterday, May 7, on approval of the con- <br />tract, the vote being 195 to 7 in favor. <br /> <br />Before the contract is awarded, 90 perqent of the <br />water must be under contract of purchase. Tabulations of <br />subscriptions as of I~y 2nd indicated that the project water <br />was oversubscribed by the irrigators in the amount of about. <br />2,000 acre-feet. <br /> <br />Invitations for bids on the construction of the <br />Vega Dam were issued on April 15 and will be opened on June <br />6. It is possible that bids will be awarded for the dam be- <br />fore the end of the present fiscal year. <br /> <br />Paonia Project <br /> <br />Completion of the definite plan report for the <br />Paonia project was scheduled for April 30. Due to a delay <br />in receiving the cost estimates, the report was unavoidably <br />delayed. We now anticipate transmitting copies of the re- <br />port to the Commissioner by May 15. <br /> <br />Detailed plans and specifications for the Paonia <br />Dam and road relocation will be completed within the next <br />two or three months. Invitations for bids on this darn can <br />then be issued when construction funds are appropriated by <br />the Congress. <br /> <br />(, <br /> <br />" <br /> <br />The report of the Department of Agriculture Field <br />Advisory Committee on this project was submitted to the De- <br />partment's Washington Advisory Committee on April 19. 1957. <br />COn1ffients from the Bureau's region 4 office on the Field <br />
The URL can be used to link to this page
Your browser does not support the video tag.