My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01580
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:25 PM
Creation date
10/4/2006 6:58:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/27/1999
Description
CF Section - Feasibility Study Grant Request - Pagosa Area Water and Sanitation District - Stevens Lake Enlargement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br />A feasibility study for the project was submitted in October 1992 by Camp Dresser & Mckee of _. <br />Denver. In April 1996, the present Construction Fund staff reviewed the report and requested _ <br />that the District update the study prior to entering into a contract for the construction loan. The <br />District indicated that there might be new project features and a request for additional funding. <br /> <br />Discussion <br /> <br />In response to the staffs request for an updated feasibility study, the District has submitted a <br />Plan of Study by Davis Engineering Service of Del Norte. The cost of the study is not expected <br />to exceed $10,000. Staff has reviewed the Plan of Study and finds that it meets the requirements <br />of the Construction Fund Guidelines and responds to the staff comments on the 1992 report. <br /> <br />The District is requesting a grant of $5,000 to assist in the cost of the feasibility study update. At <br />the same time, the District is relinquishing a $5,000 Small Dam Site grant for another project that <br />has been postponed for several years. Please see the attached letter from Carrie Campbell, the <br />District Manager. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board approve a grant of $5,000 (or fifty percent of the cost of the <br />study, whichever is less) from the Small Dam Site Account of the Construction Fund to the <br />Pagosa Area Water and Sanitation District for a feasibility study ofthe Stevens Lake <br />enlargement project. The study will be perfonned in accordance with the Plan of Study _ <br />submitted to the District by Davis Engineering Service. _ <br /> <br />Attachment <br /> <br />Cc: Carrie Campbell, Pagosa Area WSD <br />Alan Davey, Davis Engr. <br />Linda Bassi, AGO <br /> <br />tit <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.